![Mitsubishi Electric MELSEC iQ-F Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/mitsubishi-electric/melsec-iq-f/melsec-iq-f_manual_239102015.webp)
2 POSITIONING MODULE FB
2.3 M+FX5PG_JOG
13
2
FB details
Item
Description
Available device
Target module
FX5-20PG-P
Target CPU
FX5U CPU, FX5UC CPU
Engineering tool
GX Works3 Version 1.035M or later
Language
Ladder diagram
Number of basic steps
238 steps
The number of FB steps integrated in the program varies depending on the CPU module used, the input/output definition, and
the setting options of GX Works3. For the setting options of GX Works3, refer to
GX Works3 Operating Manual.
Processing
• By turning on i_bFJog (Forward run JOG command) or i_bRJog (Reverse run JOG command) after i_bEN (Execution
command) is turned on, the JOG operation or inching operation is performed.
• When i_bFJog (Forward run JOG command) and i_bRJog (Reverse run JOG command) are on at the same time, the
operation stops.
• When i_bEN (Execution command) is turned off during the operation that has been started by i_bFJog (Forward run JOG
command) or i_bRJog (Reverse run JOG command), the operation stops.
• When i_bRJog (Reverse run JOG command) is turned on during the forward run JOG operation, the operation stops.
However, when i_bRJog (Reverse run JOG command) is turned on and off, the forward JOG operation restarts. (This
relation is also applied to the reverse run JOG operation and i_bFJog (Forward run JOG command).)
• If the setting value of the target axis is out of the setting range, o_bErr (Error completion) turns on and the processing of this
FB is interrupted. In addition, the error code 100 (hexadecimal) is stored in o_uErrId (Error code). For the error code, refer to
FB compilation method
Macro type
FB operation
Always executed
Содержание MELSEC iQ-F
Страница 1: ...MELSEC iQ F FX5 Positioning Module Function Block Reference ...
Страница 2: ......
Страница 5: ...1 FUNCTION BLOCK FB LIST 3 1 MEMO ...
Страница 55: ...I 53 MEMO ...
Страница 57: ......