![Mitsubishi Electric CR750-D Series Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/mitsubishi-electric/cr750-d-series/cr750-d-series_instruction-manual_238848012.webp)
Contents
ii
Page
(2) CR751 controller ....................................................................................................................................................... 4-72
(3) CR760 controller ....................................................................................................................................................... 4-74
(1) Installing the T/B (CR750/CR760 controller) ............................................................................................... 4-78
(2) Installing the T/B (CR751 controller) ............................................................................................................... 4-79
(3) Removing the T/B (CR750/CR760 controller) ............................................................................................. 4-79
(4) Removing the T/B (CR751 controller) ............................................................................................................. 4-79
(1) CR750 controller ....................................................................................................................................................... 4-81
(2) CR751 controller ....................................................................................................................................................... 4-81
(3) CR760 controller ....................................................................................................................................................... 4-82
4.3.2 Input the serial number ............................................................................................................................................... 4-82
4.3.3 Shutting OFF the control power ............................................................................................................................. 4-84
4.5 Jog operation .......................................................................................................................................................................... 4-86
4.6 Opening and closing the hand .......................................................................................................................................... 4-87
4.7 Programming ............................................................................................................................................................................ 4-88
(1) Deciding the operation order ................................................................................................................................ 4-89
(2) Deciding the operation position name .............................................................................................................. 4-90
(3) Describing and creating the program ................................................................................................................ 4-91
(4) Confirming the program .......................................................................................................................................... 4-97
(5) Correcting the program .......................................................................................................................................... 4-98
(6) Saving the program ................................................................................................................................................ 4-101
(7) Start automatic operation. ................................................................................................................................. 4-102
5.1 Maintenance and inspection interval .......................................................................................................................... 5-104
5.2 Inspection items .................................................................................................................................................................. 5-105
(1) The battery exchange method of the CR750/CR760 controller ........................................................ 5-107
(2) The battery exchange method of the CR751 controller ........................................................................ 5-108
(1) CR750 controller .................................................................................................................................................... 5-109
(2) CR751 controller .................................................................................................................................................... 5-110
Содержание CR750-D Series
Страница 2: ......
Страница 124: ...5 112 Maintenance parts 5Maintenance and Inspection ...
Страница 125: ......