2-8 Installation
2Unpacking to installation
2.2 Installation
2.2.1 Unpacking procedures
The controller is shipped from the factory packaged in cardboard.
2.2.2 Transportation procedures
The following shows how to transport the controller.
(1) Transporting CR750/CR751 controller
Fig. 2-1 : Transporting CR750/CR751 controller
1) Slightly tilt the controller and put your hands underneath. Providing steady support with both hands, lift it up
and transport.
Be careful not to trap fingers when transporting the controller.
(2) Transporting CR760 controller
Fig. 2-2 : Transporting CR760 controller
1) Two workers must transport the controller using a crane or lifter.
Mass:
Approx. 16 - 18kg
CR750 controller
CR751 controller
Mass:
Thin type: Approx. 12kg
Heavy type: Approx. 15kg
Mass:
Non-CE marking: Approx. 95kg
CE marking specification: Approx. 296kg
Wire
Eye bolt
<Non-CE marking>
<CE marking>
Содержание CR750-D Series
Страница 2: ......
Страница 124: ...5 112 Maintenance parts 5Maintenance and Inspection ...
Страница 125: ......