![Mitsubishi Electric CR750-D Series Скачать руководство пользователя страница 114](http://html.mh-extra.com/html/mitsubishi-electric/cr750-d-series/cr750-d-series_instruction-manual_238848114.webp)
4-102 Programming
(7) Start automatic operation.
Before starting automatic operation, always confirm the following item. Starting
automatic operation without confirming these items could lead to property damage or
physical injury.
・ Make sure that there are no operators near the robot.
・ Make sure that the safety fence is locked, and operators cannot enter
unintentionally.
・ Make sure that there are no unnecessary items, such as tools, inside the robot
operation range.
・ Make sure that the workpiece is correctly placed at the designated position.
・ Confirm that the program operates correctly with step operation.
In the following explanation, automatic operation will be carried out with the controller.
Starting the automatic operation by T/B is available in the version of T/B 1.7 or later. Refer to separate "Instruc
-
tion Manual/Detailed Explanation of Functions and Operations" for details.
1) Set the T/B [ENABLE] switch to
"DISABLE".
2) Set the controller mode to "AUTOMATIC".
3) Press the controller [CHNG DISP] switch
twice, and display the "OVERRIDE" on the
STATUS NUMBER display panel. (A "o" will
appear at the lower left.)
Press the [DOWN] key several times, and
display "10".
The operation speed will be set to 10%.
The servo will turn OFF when the controller mode is changed.
Note that axes not provided with brakes could drop with their own weight.
CAUTION
Down:
ENABLE
*Lighting
Up :
DISABLE
Rear of T/B
MODE
MANUAL
AUTOMATIC
Prepare the controller
Set override
Dsiable the T/B
Enable the R/C
Dsiplay
override
Set override
CHNG DISP
DOWN
UP
* Following figures are CR750 controller's switch and display panel.
CAUTION
Содержание CR750-D Series
Страница 2: ......
Страница 124: ...5 112 Maintenance parts 5Maintenance and Inspection ...
Страница 125: ......