[
VII
Control ]
- 90 -
HWE0716A
GB
-11- Control at Initial Start-up
When started up for the first time before 12 hours have elapsed after power on, the unit goes into the initial startup mode.
At the completion of the initial operation mode on the OC, OS, they will go into the normal control mode.
1. Flowchart of initial operation
(1) HP72, HP96 models
(2) HP144, HP192 models
*1
Qj:Total capacity (models) code
Refer to the VII [1] 2. (1) Dipswitches for the capacity code.(page 80)
50 F 60Hz
or F < 50Hz
Initial startup mode starts.
Completed in the integrated operation time of 35 minutes.
Initial startup mode complete
Completed in the integrated operation time of 90 minutes.
Yes
No
50 F 60Hz (both OC and OS)
or F < 50Hz (both OC and OS)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OC remains in operation, and the
compressor on the OS starts up.
50 F 60Hz (OC)
or F < 50Hz (OC)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OC starts up.
Both the OC and OS stop.
The startup sequence of the OC and OS is rotated.
50 F 60Hz (OS)
or F < 50Hz (OS)
Completed in the integrated operation time of 35 minutes.
Completed in the integrated operation time of 90 minutes.
The compressor on the OS starts up.
*2
*3
*2
The air conditioning load is too small
for both the OC and the OS to
simultaneously stay in operation.
*3
The air conditioning load is
high enough for both OC and OS to
simultaneously stay in operation.
Initial startup mode complete
The compressor on the OC starts up.
The total operating load of the indoor unit
after 5 minutes of operation is P250 or above.
(*1 Qj 50)
Initial startup mode starts.
F 60Hz
Содержание City Multi PUHY-HP144TSHMU-A
Страница 1: ......
Страница 9: ...HWE0716A GB ...
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 53: ... 44 ...
Страница 63: ... 54 ...
Страница 71: ... 62 ...
Страница 73: ... 64 ...
Страница 76: ... 67 HWE0716A GB VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 69 2 Principal Parts and Functions 70 ...
Страница 77: ... 68 ...
Страница 83: ... 74 ...
Страница 85: ... 76 ...
Страница 109: ... 100 ...
Страница 125: ... 116 ...
Страница 220: ... 211 HWE0716A GB X LED Monitor Display on the Outdoor Unit Board 1 How to Read the LED on the Service Monitor 213 ...
Страница 221: ... 212 ...
Страница 265: ......