4
A
B
1
C
C
C
D
2
E
A
Downward slope 1/100 or more
B
Drain hose (Accessory)
C
Indoor unit
D
Collective piping
E
Maximize this length to approx. 10 cm
A
B
D
E
C
C
C
C
C
C
C
C
Terminal bed for transmission cable
D
Transmission cable
(To terminal bed for remote control-
ler, indoor unit and BC controller)
E
To single-phase power supply
F
Terminal bed for power supply
G
To terminal bed for outdoor transmis-
sion cable
(Use shielding earth cable
on out-
door unit side.)
H
Non-polarity
I
Network remote controller
J
DC 24 to 30 V
7
7.2
[Fig. 7.2.1]
[Fig. 8.2.1]
A
Terminal block for indoor trans-
mission cable
B
Terminal block for outdoor
transmission cable
C
Remote controller
[Fig. 8.2.2]
M2
DC24~30V
M1
(A, B)
1
2
D
A
C
L
N
DC10~13V
A
B
1
2
L
N
1
2
A
C
B
A
Non-polarized
B
Upper level (TB15)
C
Remote Controller
D
Lower level (TB5)
[Fig. 8.2.3]
[Fig. 8.2.4]
A
Switch 16 A
B
Overcurrent protection 16 A
C
Indoor unit
D
Total operating current be less than 16 A
E
Pull box
A
Insert the pump’s end 2
to 4 cm.
B
Remove the polyethylene
plug.
C
About 1000 cc
D
Water
E
Filling port
[Fig. 7.3.1]
D
I
C
H
G
K M
I
J
5
L
C:
within 41 cm
G
Drain hose (Accessory)
s
Be sure to use the supplied
drain hose (Accessory).
H
Less than 300 mm
I
Hard vinyl chloride 90
°
elbow
(field supply)
J
Hard vinyl chloride (VP-25) (field
supply)
K
Tie band (small) (Accessory)
L
170
±
5 mm
M
Hose band (Accessory)
[Fig. 7.2.4]
C
C
C
D
4
H
H
Take as large
as possible.
About 10 cm
[Fig. 7.2.3]
8
8.1
[Fig. 8.1.1]
CN62
SW1
MADE IN JAPAN
ON
SW14
N0
N0
W254613G03
FP-AD
JP2
JP3
JP4
CN82
8
1
6
1
10
1
240V
220V
SW5
JP1
SWC
SWA
1
3
2
0
SW12
10
0
SW11
1
0
<Address board>
8.2
A
B
A
Cover
B
Cover securing screw (2 places)
[Fig. 8.3.1]
8.3
[Fig. 8.4.1]
[Fig. 8.3.2]
8.4
1 2
J
I
L
N
G
D
E
F
C
H
2
1
2
A
G
F
A
B
3
A:
25 cm
B:
1.5 – 2 m
A
Downward pitch of more than 1/100
F
Insulating material
G
Metal brace
[Fig. 7.2.2]
7.3
TB5
TB5
S
M1M2
S
M1M2
TB3
M1M2
A
A
B
C
C
TB5
TB15 TB5
TB15
S
M1M2
S
M1M2
TB3
M1M2
2
1
2
1
A
A
B
C
C