
Chapter 4 Operational Verification Tests
4. Operational Verification
Tests
These Operational Verification Tests should
be performed periodically, as required by your
departmental procedures.
Installing the Batteries
The first time you take your UltraRadiac-Plus
out of its shipping carton, you’ll have to
install its batteries. See
The Batteries
on page
49 for instructions.
CAUTION:
Use of non-rechargeable
batteries or rechargeable
batteries other than those
supplied or recommended by
Mirion Technologies
(Canberra) may cause an
explosion or other fire hazard
resulting in personal injury.
Mirion Technologies
(Canberra) is not liable for
personal injury or damage
resulting from the use of
incompatible batteries.
16
Содержание UltraRadiac-Plus
Страница 1: ...Radiation Safety Amplified UltraRadiac Plus Personal Radiation Monitor 7068914D User s Manual ...
Страница 2: ...UltraRadiac Plus Personal Radiation Monitor 7068914D User s Manual ...
Страница 7: ...B Default Alarm Settings 65 C Display Units 66 D Glossary 68 E Disposing of This Equipment 70 iv ...
Страница 59: ...Chapter 6 Maintenance Figure 10 Location of the Batteries Figure 11 The Battery Polarity Indicators 50 ...
Страница 66: ...The Carrying Case Figure 15 Using the Carrying Case 57 ...
Страница 76: ... The centi prefix will be seen only on UltraRadiac s displaying sievert units 67 ...