13
1. Plumbing
Read Section 2, "Important Safety Information" first.
1.1. The Mira Advance ATL is normally connected to the cold water mains-fed
supply.
1.2. The Mira Advance ATL is suitable for installation within the shower area and
must be positioned over a water catchment area with the controls at a
convenient height for the user. The shower fitting should be positioned so that
it discharges down the centre line of the bath, or across the opening of a shower
cubicle, and must be directed away from the Mira Advance ATL .
1.3. The Mira Advance ATL is fitted with an inlet connector assembly that is
designed to accept plumbing supplies from the top, bottom or back. The water
supply can be fed with 15mm pipe or 10mm microbore pipe, suitably adapted
for the inlet connector assembly. If 10mm microbore is used, then an allowance
for increased pressure loss must be made to ensure that the minimum
maintained inlet pressure of 1 bar is achieved (refer to specification).
1.4. At pressures below 1 bar maintained the full flow performance may not be
achieved.
1.5. The Mira Advance ATL must be fitted ONTO the finished wall surface i.e.
on top of the tiles. DO NOT block the air ventilation gaps around the sides
of the unit, either by tiling up to the sides of the unit or by using a sealant
around the case (Small pillars moulded on to the back of the case allow air
circulation). This Mira Advance ATL is designed to be ventilated. Failure to
do this may cause product failure (refer to Figure 1).
1.6. Use only the inlet connector assembly supplied with the Mira Advance ATL, do
not use any other types of fitting.
Section
7
Installation Requirements
Figure 1
Figure 2
Spill-over Level
25 mm minimum
Содержание Advance ATL
Страница 48: ...48 SpareParts ...
Страница 55: ...55 Notes ...