MIOX RIO Zuni 1 Скачать руководство пользователя страница 23

 

MIOX RIO Zuni™ Operators Manual 

 

 

P/N: 102-00094-I 

Page 23 

 

Normal Operation 

 

The system is within the normal operating window for oxidant generation and is 

running correctly 

Startup/Shutdown 

 

During the startup and shutdown modes of operation, the system flushes the lines 

and cell with water to remove any excess salt that may crystalize and clog the plumbing 
while the system is not in use. After the system enters this mode, it will automatically enter 
Normal Operation or Standby after the flush is performed depending on whether or not it 
was startup or shutdown.  

NOTE: Excessive startups/shutdowns will dilute the oxidant in the storage tank due to the 
excess water being added to the tank. 

System Fault 

 

The system has encountered an abnormality in the operating parameters and is 

either attempting to resolve it automatically (flashing) or needs manual resetting and 
inspection (solid). Refer to the Fault Conditions sub-section of the Troubleshooting guide 
included in this manual for more information of fault conditions and actions to remove them. 

Brine Supply Issues 

 

If the system has an abnormally high brine pump duty, the LED will flash blue. High 

brine duty can be caused by a number of things all relating to the amount of salt entering 
the cell. Check brine lines for leaks/clogs, brine salt concentration levels, and pump hoses to 
ensure that they are all in working order. If the problem persists, contact your customer 
support provider for additional troubleshooting assistance. 

LCD Display 
The display constantly updates with the current operating conditions of the system. 
Information including system hours, cell hours, operational mode, cell current, inlet 
temperature and outlet temperature cycles continuously through the display when in ‘Run’ 
mode. 

Level Switch Assembly 
The level switches in the oxidant tank act as the ‘Run/Stop’ switch for the unit. When both 
level switches are low, the OSG enters ‘Run’ mode and makes oxidant until both level 
switches are high. Once both level switches have been triggered high, the unit enters 
‘Standby’ until both level switches are again in the low position.  

If desired, the unit may be put into constant run mode by connecting together the two 
halves of the level switch cable on the back I/O panel. This will bypass the level switches 
and prevent the unit from ever going into standby. 

Communications 

Содержание RIO Zuni 1

Страница 1: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 1 RIO Zuni Series On Site Generator 1 0 and 2 0 Installation Operation and Maintenance Manual 1 December 2017...

Страница 2: ...to make these changes without prior notice or liability Portions of the MIOX OSGs are covered by U S Patent Customer Service 5601 Balloon Fiesta Parkway NE Suite A Albuquerque NM 87113 Phone 1 505 343...

Страница 3: ...Specifications 7 System Illustrations and Component Descriptions 8 INSTALLATION AND STARTUP 15 In the Box 15 What you need 15 Tools for install 16 Installation Location Requirements 16 Connections 16...

Страница 4: ...IO Zuni 2 0 lb OSG showing cells thermowells and I O panels 12 Figure 5 RIO Zuni OSG I O panels with labeled components 13 Figure 6 One of two level switches before being installed in an oxidant tank...

Страница 5: ...vels MCLs and the operator must be capable of reliably operating the technology The on site oxidant category was added to this list in 1997 primarily based on independent research of MIOX technology L...

Страница 6: ...f Free Available Chlorine FAC per day depending on the model ordered When producing oxidant the RIO Zuni system is automatically controlled by a pair of level switches inside the oxidant storage tank...

Страница 7: ...ph 4A 50 60 hertz Air Temperature Required 40 F to 110 F 4 C to 43 C Recommended Feed Water Temperature 55 to 80 F 12 to 27 C Allowable Feed Water Temperature 40 to 95 F 4 to 35 C Feed Water Pressure...

Страница 8: ...d oxidant generator OSG Water supply Fresh water supply for the OSG Runs through Inline Pressure Reducer assembly before connecting to OSG Brine supply Low pressure supply of saturated brine to the OS...

Страница 9: ...ol board power supplies and other electronic components of the RIO Zuni System See Figure 3 for details Brine Pump An automated peristaltic pump which controls the system s brine flowrate and acts as...

Страница 10: ...to reduce line pressure to an appropriate pressure for the OSG Kit has a female NPT inlet connection See Figure 7 and Appendices for details Integrated Brine Tank Optional Optional integrated tank wi...

Страница 11: ...Zuni Operators Manual P N 102 00094 I Page 11 Figure 3 RIO Zuni 2 0 lb OSG with labeled system components System cover not shown LCD Display LED Indicator Water Pump Brine Pump Electrical Enclosure Ch...

Страница 12: ...rs Manual P N 102 00094 I Page 12 Figure 4 RIO Zuni 2 0 lb OSG showing cells thermowells and I O panels Electrical Back Panel Thermowells T shaped elements in plumbing line 2 MIOX RIO Zuni Electrolyti...

Страница 13: ...l P N 102 00094 I Page 13 Figure 5 RIO Zuni OSG I O panels with labeled components Power Entry Module USB Port for data logging Ethernet Port Fuse Holder ON OFF Switch Oxidant Outlet Water Inlet Brine...

Страница 14: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 14 Figure 6 One of two level switches before being installed in an oxidant tank Figure 7 Inline Pressure Reducer assembly...

Страница 15: ...nks are labeled properly Disconnect power before working on the system Do not reconnect the power to the rear panel until installation is complete All MIOX systems require a good earth ground A neutra...

Страница 16: ...roximately 5 feet long by 5 feet wide 1 52m by 1 52m The ambient air temperature at the installation location must be between 40 F 5 C and 110 F 43 C Additional space may be required for the water bri...

Страница 17: ...IOX All RIO Zuni OSG systems ship with a pre installed 2A or 4A fuse depending on model A spare fuse is also included with the unit NOTE Failure of the system that can be traced to a poor power source...

Страница 18: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 18 Figure 8 RIO Zuni Connections...

Страница 19: ...er source to the brine tank using the 1 4 diameter LDPE tubing Secure with hose clamps Leave valves closed 5 Connect Water Brine Inputs to OSG Use the smaller diameter clear vinyl tubing to connect th...

Страница 20: ...ource valve 13 Brine Saturation Wait 30 minutes to 1 hour to allow brine to fully saturate before turning system on 14 Turn System On Turn on the unit by switching the power switch on the back panel T...

Страница 21: ...ough multiple priming cycles before liquid reaches the unit MIOX recommends minimizing the length of hose in between the water and brine supplies and the OSG NOTE Assure there are no kinks or pinches...

Страница 22: ...efficacy for up to 5 days Interface elements LED The colored LED on the front of the OSG indicates the operational mode of the unit Solid or flashing green indicates that the system is normal operatio...

Страница 23: ...the system has an abnormally high brine pump duty the LED will flash blue High brine duty can be caused by a number of things all relating to the amount of salt entering the cell Check brine lines fo...

Страница 24: ...ted Troubleshooting Fault Conditions The RIO Zuni is preprogrammed with a number of fault conditions which trigger whenever the system is running atypically The faults are classified as either hard or...

Страница 25: ...nnected to unit and fuse is not blown 2 Contact Customer Support for guidance on troubleshooting and or getting the power supply replaced MIOX system chlorine production lower than normal or chlorine...

Страница 26: ...erature too low 2 Temperature sensor failure 1 Increase feed water temperature to above 50 F 10 C prior to restarting system 2 Temporarily swap the thermowell assemblies or otherwise verify correct te...

Страница 27: ...s preassembled with secured plumbing connections which should never require replacement however if any of the internal plumbing connections are broken the connections should be resealed with zip ties...

Страница 28: ...e The OSG will still contain a small amount of liquid within the internal plumbing as well as the cell s This will begin to drain out of the unit once the lines are disconnected Use a bucket placed un...

Страница 29: ...electrical connections by performing steps 1 and 2 in reverse order Once the unit is back to its normal operating configuration but with the plastic cover still removed turn on the unit and monitor i...

Страница 30: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 30 Figure 10 RIO Zuni OSG with system cover and screw locations...

Страница 31: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 31 Figure 11 Internal Top View of Zuni Showing Cell Hour Reset Button Location Brine Small Pump Front of Unit Cell Hour Reset...

Страница 32: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 32 APPENDICES a Inline Pressure Reducer b Changing Pump Tubes c Water Quality Guidelines d Spare Parts Identification Ordering Guide...

Страница 33: ...flon Tape The tape should be wrapped 3 times 3X around the threads Screw one end of the Coupling into the PRV and then screw the adapter into the other end of the Coupling Connections should be hand t...

Страница 34: ...Zuni Operators Manual P N 102 00094 I Page 34 Changing Pump Tubes The following pages show how to change the pump tubes on the RIO Zuni peristaltic pumps They are excerpts from the Welco Instruction...

Страница 35: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 35...

Страница 36: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 36...

Страница 37: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 37...

Страница 38: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 38...

Страница 39: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 39...

Страница 40: ...Pb mg L 2 mg L Dissolved Sulfides as H2S mg L Ammonia Nitrogen NH3 N mg L Organic Nitrogen Org N mg L Total Organic Carbon TOC mg L pH 5 9 Water Temperature Range F or C 55 80 F 12 27 C Caution water...

Страница 41: ...hooting event where identifying or replacing a part may be necessary Additionally these parts can be ordered and kept on hand as a spare in case a replacement is needed in a more time sensitive manner...

Страница 42: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 42 PUMP WP11 3 16 STEP PHARMED 301 00375 TUBE 1 8 135 WT6 PHARMED 301 00376 TUBE 3 16 2 WT6 PHARMED 301 00377...

Страница 43: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 43 TUBING 1 4 x 3 8 300 00349 ADAPTER 1 4x1 4x1 4 BARB HDPE 300 02757 ADAPTER 3 8x3 8BARBx1 4 HDPE 300 02759 BULKHEAD 1 4 NUTS STR NYLO 300 02640...

Страница 44: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 44 TUBING 3 8 OD PE 700 00447 TUBING 3 8 ID x 5 8 OD VINYL 700 00447 CLAMP HOSE SNAP 3 8 OD ACETAL 700 01193 CLAMP HOSE SNAP 5 8 OD ACETAL 700 00449...

Страница 45: ...rators Manual P N 102 00094 I Page 45 FUSE 5x20mm 4A 250V 2PPD SYSTEM 400 02548 FUSE 5x20mm 2A 250V 1PPD SYSTEM 400 01199 ASSY CELL LEAD 1 400 02557 D ASSY CELL LEAD 2 400 02558 D ASSY TEMP SENSOR 1 4...

Страница 46: ...MIOX RIO Zuni Operators Manual P N 102 00094 I Page 46 CONTROL BOARD ASSY 400 02083 04 POWER SUPPLY 240W 15V 16A 400 02078...

Отзывы: