
15
Management: Schedule
This allows the administrator to schedule turning OFF/ON the RPM’s outlets.
Outlet:
Assign the outlet to be controlled in this schedule.
Outlet Action:
Select the action you want to occur.
Date:
When selecting the Once option a specific date must be entered. When selecting the ‘Every’ option
you can set the schedule for an outlet using an assigned weekly day, or every day.
Time:
Set the time for the action to occur.