![MingTai SUN12 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/mingtai/sun12/sun12_operation-manual_1801431013.webp)
11
9. Maintenance and Service
Shut off the power before service or components’ replacement, and the
service or replacement work shall be done by the technician.
Working environment minimum brightness to 215 + 15 lx.
9.1 Clean the top water tank by disinfectant or alcohol once a week.
9.2 Disinfect and clean the interior surface of the Steam Sterilizer chamber
monthly.
9.3 Replace the fuse.
Fuse Type: 250V,15A
Check the parameters of new fuse is correct .
1)
Before change the fuse, turn off the power, and must pull out the plug.
2) Revolve the fuse base by counter-clockwise by screwdriver to bring out the
melting fuse to be replaced;
3) Replace the new fuse and reset the fuse base on the original position, then use
the screwdriver to fasten the base by clockwise.
4)Check the correctness of the data of the new fuse replaced.
9.4 Clean the sealing ring periodically
The operator shall clean the sealing ring periodically for avoiding the influence to
the seal caused by the dust/dirt left due to the long period use. Use the smooth
cloth with distilled water to wipe the surface of the sealing ring or sealing cap
gently. The user shall discharge the sealing ring for further cleaning or
replacement if the air-leaking problem can not be resolved after the above process
(The user shall discharge the sealing ring periodically for cleaning and inspection
as recommendation by the supplier).
9.5 The replacement work for sealing ring
Tool: One flat screwdriver (No sharp edge at the head)
1) One hand catches the lip of the sealing ring, the other hand insert the
screwdriver into the clearance between the sealing ring and the door for raise up
the sealing ring.
2)After raising up part of the ring, you can use hand to draw the whole ring out.
Wash its groove after drawing out the ring and pay attention to see whether it’s
spoiled or not in consideration of the necessity of replacement.
3)Put back the ring to the original door groove after cleaning. Most Important: the
inset work must be done equably to the groove During the installation, the laid
four equal points of the ring must be inserted to the groove firstly, later for the
same work for the remaining segments of the ring. After finishing, press the
sealing ring equally by the force of hand.
Содержание SUN12
Страница 18: ...16 NO 2 Steam loop Work Description...