I
NSTALLATION
- 17 -
4-5
I
NSTALLATION OF THE
V
ENT
F
ILTER
Obtain the Vent Filter.
Insert the Vent Filter firmly into the port (A, B).
A
B
4-6
I
NSTALLATION OF THE
T
YGON
T
UBING
Locate the clear Tygon Tubing and the Barbed Fitting from the Accessories Bag.
Screw the Barbed Fitting onto the bottom end of the POU Dispenser (C).
Do not use any white tape on the threads of the
Barbed Fitting. An O-ring is located inside the
POU Dispenser to ensure water tightness between
the threads of the POU Dispenser and the Barbed
Fitting.
Push one end of the Tygon Tubing onto the end of the Barbed Fitting (D). Place the other end of the
Tygon Tubing in a sink.
C
D
ATTENTION
Содержание DIRECT-Q 3 SYSTEM
Страница 1: ...User Manual DIRECT Q 3 SYSTEM DIRECT Q 3 UV SYSTEM...
Страница 58: ...MAINTENANCE 50 G H...
Страница 60: ...MAINTENANCE 52 M...
Страница 63: ...MAINTENANCE 55 G H...