OM-267043 Page 20
5-12. Display Board (PC22) DIP Switch Settings
Accessing DIP Switch
1
Lens
DIP switch is located under the lens
next to the displays.
2
Lens Screws
Remove three screws.
Loosen upper right hand screw to
rotate lens enough to access DIP
switch.
Replace three screws removed
earlier.
Tighten upper right hand screw.
.
The two upper screws must
engage the backing plate to
properly secure the front panel.
2
1
Factory DIP
switch settings
when displaying
meters per
minute
Factory DIP
switch settings
when displaying
inches per
minute
DIP Switch Settings:
Display Hold OFF
−
Set switch 1 so the depressed section is toward OPEN as labeled on the switch.
Displays will not hold values. The voltage displayed while welding is an average reading over a time span of 6 to 8 sec-
onds. If the weld time is less than 8 seconds, the voltage displayed may not be accurate.
Display Hold ON (Factory Default)
−
Set switch 1 so the depressed section is toward 1 as labeled on the switch.
Displays will hold their last value for five seconds after the trigger is released. The voltage displayed while welding is
an average reading over a time span of 6 to 8 seconds. If the weld time is less than 8 seconds, the voltage displayed
may not be accurate.
12
3
4
5
−−
−−
OP
E
N
−−−
−
123
4
5
−−
−−
OP
E
N
−−−−
12
3
4
5
−−−−
OP
EN
−−−
−
123
4
5
−−
−−
OP
E
N
−−−−
Содержание FieldPro Feeder CE
Страница 4: ......
Страница 6: ......
Страница 35: ...OM 267043 Page 29 SECTION 8 ELECTRICAL DIAGRAM 257 274 C Figure 8 1 Circuit Diagram For Wire Feeder...