
Installation
10/2018
Version 4.0en
Operating Manual Tabeo Sintering Oven Metal
Page 17
1.
Align the supporting surface horizontally.
Lift and carry the sintering oven only at the unit base.
2.
Place the sintering oven on the supporting surface.
$
Make sure the surface is non-slip.
Electrical connection
Local installation
$
Warning
Release of pollutants!
Pollutants can be inhaled when the insulating materials are handled.
h
Wear personal protective equipment (respiratory protection) during
disposal.
;
The sintering oven requires its own electrical circuit.
;
The building's electrical circuit must have a type-K or type-Z circuit
breaker with a rated current of at least 16 A (other types of circuit
breaker depending on the country of use).
;
An additional residual-current circuit breaker (designed for 30 mA
tripping current) must be installed.
;
To ensure electrically safe operation, the sintering oven requires a
protective earth conductor connected to the power socket.
;
When selecting the installation location, ensure that the accompany-
ing mains cable is 2.0 m long. Extending the cable is not permitted.
The supply voltage must be within the rated voltage range of 200 -
240 V (see „Technische Daten“ on page 12).
$
Danger
Electricity!
Risk of death from electric shock.
h
Do not touch live cables and components with wet hands.
h
Observe the accident-prevention regulations when working with elec-
tric current.
h
Only connect the unit to a voltage supply that matches the specifica
-
tions on the rating plate.
Содержание TABEO Series
Страница 46: ......