ASAP 2460 Operator’s Manual
Routine Maintenance
246-42800-01 - Aug 2013
7-23
d.) Observe the high pressure gauge. If the pressure decreases, tighten the nut connecting the
regulator to the gas bottle. If the pressure is stable, proceed to step e.
e.) Turn the pressure regulator control knob clockwise until the low pressure gauge indicates 15
psig (100 kPag). Open each regulator shut-off valve by turning it counterclockwise. Open the
gas bottle shut-off valve. Flow gas for 10 to 30 seconds, then close each valve. These actions
purge the regulator and gas inlet tubing.
f.) Ensure that the gas shut-off bottle valve is completely closed (turn clockwise).
5.
Repeat steps 1 through 4 for each gas supply bottle to be attached to the analyzer.
6.
Proceed to the next section to connect the copper delivery tubing to the analyzer.
Connecting the Gas Delivery Tubing to the Analyzer
The gas inlet ports are located on the right side panel of the analyzer. The ports are labeled
1
through
6
.
To change the gas attached to one of the ports:
1.
Make sure the port valve is closed (refer to
).
2.
Detach the gas line from the desired port.
3.
Attach the new gas line to the port.
4.
Make sure any unused gas inlet ports are plugged.
5.
Record the gas installed in the port in the analysis program as described in the following section.
If you are using hazardous gases, make sure the gas supply
equipment is adequately vented to prevent purging the regulator
and tubing into the lab atmosphere in the following step.
Содержание ASAP 2460
Страница 4: ......
Страница 12: ...Table of Contents ASAP 2460 Operator s Manual viii 246 42800 01 Nov 2013...
Страница 30: ...Using the Software ASAP 2460 Operator s Manual 1 18 246 42800 01 Aug 2013...
Страница 93: ...ASAP 2460 Operator s Manual Generating Graph Overlays 246 42800 01 Aug 2013 2 63...
Страница 94: ...Generating Graph Overlays ASAP 2460 Operator s Manual 2 64 246 42800 01 Aug 2013...
Страница 202: ...Service Test ASAP 2460 Operator s Manual 4 36 246 42800 01 Aug 2013...
Страница 230: ...Report Examples 2460 Operator s Manual 5 28 246 42800 01 Aug 2013 Isotherm Linear Plot...
Страница 231: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 29 BET Surface Area Report...
Страница 232: ...Report Examples 2460 Operator s Manual 5 30 246 42800 01 Aug 2013 BET Surface Area Plot...
Страница 233: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 31 t Plot Report...
Страница 234: ...Report Examples 2460 Operator s Manual 5 32 246 42800 01 Aug 2013 BJH Adsorption Cumulative Pore Volume...
Страница 235: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 33 BJH Desorption Cumulative Pore Volume...
Страница 236: ...Report Examples 2460 Operator s Manual 5 34 246 42800 01 Aug 2013...
Страница 242: ...Service Test Mode 2460 Operator s Manual 6 6 246 42800 01 Aug 2013...
Страница 270: ...Calibrating the System ASAP 2460 Operator s Manual 7 28 246 42800 01 Aug 2013...
Страница 276: ...Ordering Information ASAP 2460 Operator s Manual 8 6 246 42800 01 Aug 2013...
Страница 278: ......
Страница 280: ......
Страница 374: ...Appendix C ASAP 2460 Operator s Manual C 50 246 42800 01 Aug 2013...
Страница 398: ...Appendix F ASAP 2460 Operator s Manual F 18 246 42800 01 Aug 2013...
Страница 412: ...Index ASAP 2460 Operator s Manual Index 8 246 42800 01 Aug 2013...
Страница 413: ...ASAP 2460 Operator s Manual Appendix G Aug 2013 SVP 1 SVP Smart VacPrep Operator Manual...
Страница 414: ...Appendix G ASAP 2460 Operator s Manual SVP 2 Aug 2013...
Страница 415: ...OPERATOR MANUAL Smart VacPrep Operator Manual Nov 2013 SMART VACPREP INTELLIGENT VACUUM SAMPLE PREPARATION SYSTEM...
Страница 422: ...Contact Us vi Smart VacPrep Operator Manual...
Страница 432: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Страница 466: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...