
BBV, SBV Series Natural Vent Gas Fireplaces
SIGNATURE COMMAND -
ELECTRICAL INSTALLATION
JUNCTION BOX WIRING
is s ould be done be ore ramin t e ireplace ire
t e receptacle into an electrical circuit ire it mini
mum
ire in accordance it prevailin codes
emove t e e ternal unction bo cover by removin
t e scre rom t e side o t e outside irebo all
unction bo as installed at t e actory
e unction bo cover as a actory installed rome
style strain relie connector ter connectin t e ires
route t e ire leads t rou t is connector e er to
t e irin dia ram in
igure
Figure 26 -
Junction Box Wiring Diagram
FP1912
Junction box wiring
8/08
unction o
actory upplied
ot upplied
COMMAND CENTER WALL INSTALLATION
e command center may be mounted on t e all it
t e use o t e
it
t cable unction bo all
cover
ount t e unction bo provided at t e desired location
on t e all Do not e tend beyond t e
t ire cable
provided I a lon er distance is re uired t e t may be
e tended up to t ma imum by usin t o
cables plu ed to et er
oute t e ire rom unction bo to lo er control area at
bottom o ireplace nplu t e
cable rom t e com
mand center ttac t e connector to t e pins rom ire
by pus in in to connector makin sure to ollo t e color
code on connector lu t e t e tension cable into t e
t cable emove command center rom t e ireplace
and plu t e ot er end o t e e tension cable into t e
command center nap on all cover provided and scre
to unction bo
WALL SWITCH INSTALLATION
e all s itc ire connection is located o t e t ire
arness rom t e control bo to t e command center
ig
ure
.
e connection is labeled
all
itc
nplu
t e male and emale connectors and connect t e t o
lo volta e ires provided un ire to desired location
on all p to
t o
a ire may be used i neces
sary ttac ires to all s itc ount t e all s itc in
to unction bo and scre on cover
W
ARNING
Do not connect wall switch to 110 V
circuit.
Содержание 400BBNSC
Страница 48: ...MHSC leveland Drive aris entucky m sc com...