
BBV, SBV Series Natural Vent Gas Fireplaces
VENTING INSTALLATION
FIRESTOPS
ocate c imney centerline dimension rom a com
bustible back all
igures .
inimum irestop
dimensions are ound in t e vent manu acturer s in
structions learances to combustibles may also be
ound on t e sides o t e lue sections
void cuttin any load bearin ramin members
igures
o position irestop re er to
igures
nly one irestop
is re uired per rame
FP2020
firestop
10/08
ails
irestop
pacer
oist
ails
irestop
pacer
oist
Figure 7 -
Install Firestop in Attic
Figure 8 -
Install Firestop
in Ceiling
NOTICE: When installing in a chase, you should insu-
late the chase as you would the outside walls of your
home. This is especially important in cold climates.
Insulation should be considered a combustible ma-
terial. Maintain proper clearances to all combustible
materials.
NOTICE: Treatment of firestops and construction of
the chase may vary from building type to building
type. These instructions are not substitutes for the
requirements of local building codes. You must fol-
low all local building codes.
TERMINATE THE PIPE
aintain proper clearance to t e roo usin t e
c art belo
ents s all terminate at least rom a vertical
all
aintain minimum clearance to any ot er as
terminations or plumbin vents as measured rom
t e outside ed e o t e terminations or vents
H
X
12”
F P 2405
min ch imney h t
Figure 9 -
Minimum Chimney Height
Termination Height Table
se t is table to determine t e minimum ei t avove
t e roo
Minimum Height
Roof Pitch
Feet
Meters
lat to
ver
to
ver
to
ver
to
ver
to
ver
to
ver
to
Содержание 400BBNSC
Страница 48: ...MHSC leveland Drive aris entucky m sc com...