
30
Figure 6-1: Checkout Test Set-Up
3
Spread the Test Cables as Far Apart as Possible.
Insert the ground spike and attach the black cable. Insert a screwdriver into the
ground and connect the red cable to it. This will create a simulated fault.
This test can also be done by pushing the metal end of the clamps directly into the
ground so that they make electrical contact.
When using a carpet in this checkout procedure connect test cable clamps directly to
the carpet.
4
Turn the transmitter Mode switch to “FAULT & LINE LOCATE .
Look at the battery % level for battery condition.
5
Synchronize the Receiver.
Hold the A-Frame so the black spike is closest to the ground connection. Push the A-
Frame into the ground.
6
Push the Receiver On/Off Switch to “ON”.
The A-Frame Receiver will repeat the battery test. After the battery test, the arrow
facing the simulated fault (red test clamp) flashes and a potential gradient number is
displayed on the Active and Reference LCD display
7 Rotate the A-frame 180 Degrees.
Note that the arrow now facing the red test clamp flashes. As the A-Frame is
moved around the fault the arrow closest to the simulated fault should flash.