1 Transport
Immediately upon receipt, examine the Heat Pump Module (HPM) to make sure that it is intact
and undamaged. If not, inform this to the shipping company immediately. All shipments are the
responsibility of the recipient unless otherwise agreed.
1.1 Delivery mode
METROAIR AQUA HPM is delivered without condensate drain tube and the safety equipment for
the water circuit.
1.2 Storage
METROAIR AQUA HPM must be stored and transported upright free of water and within its
packaging.
Transport and storage may take place at temperatures between -10 °C and +50 °C. If the unit
has been transported or stored at sub-zero temperatures leave the unit at room temperatures
for 24 hrs before commissioning.
1.3 Transport with trolley
When transporting the METROAIR AQUA HPM by trolley the unit shall be in its disignated trans-
portation box and transportet upright. The box shall be lifted from the disignated side.
Make sure that the trolley does not damage the cabinet or the various connections.
1.4 Tilting of unit
When carefully and manually transporting the METROAIR AQUA HPM over a short distance to
its final location the unit can be tilted up to 45°. If this limit is exceeded, the METROAIR AQUA
must be left in its normal upright position for at least 1 hour before it is started.