6 Commissioning
6.1 Leak test
After installation it is necessary to check that the entire water installation is tight. This is
accomplished by performing a water leak test. Also check that the drain water trap on the
condense water hose/pipe has a min. height of 60 mm and that the drainage is unobstructed.
6.2 Commissioning of the water circuit
Fill the water tank/system via the cold water connecting branch and deaerate.
6.3 Commissioning of the air circuit
Ensure that the air in- and outlet paths are open and ready for use.
6.4 Commissioning of the electrical circuit
Power up the unit. A counter displays the numbers 1 to 9 followed by display of the controller
model (172) for 3 sec. and the software version for 3 sec. Then the top of water tank
temperature is displayed and the unit engages operation.
The METROAIR AQUA HPM is now ready for use.