Check the following when installing the meter
1.
The meter has been installed in the correct flow direction.
2.
The meter has been installed without any leaks.
3.
The meter has been installed without any tension.
●
In a horizontal pipeline, the meter is installed with the meter index head in an
upright position. In the case of vertical installations, the oil pump (if present) must
be installed in an upright position.
●
Connection screws and nuts must be tightened crosswise.
●
See section 13, page 32, for instructions on connecting to the pressure measuring
points.
●
See section 13.2, page 32, for instructions on connecting to the temperature
measuring points.
4.
The angle of rotation of the meter display corresponds to the operator’s requirements,
see “Changing the turning range”, page 14.
It is recommended that a protective cover is fitted in the case of external installations.
After installing the meter:
Welding work on the pipeline or on the flanges near to the
meter is not permitted.
13