MTCC
Jobber Plus
P a g e - 7
If you follow this step by step procedure, you will find that installing the
Jobber Plus
is easier
than any other punch press control on the market.
Jumpers
Do NOT remove any of the factory installed jumpers until the control is installed and func-
tioning without any additional components. i.e. Light Curtains, Foot Switches, Remote Top
Stop or E-Stop buttons, Tonnage Monitors, Die Protection, etc. In this way you know that
the control is operating properly before you add additional components. You can pull the
necessary wires for these additional components, but don’t hook them up until the machine is
operating properly without them. When adding them, do so one at a time, testing the machine
and the control’s operation after each one is wired.
Direction of Rotation
Determine the machine’s direction of rotation , CW or . You will need this information later
during the installation process. Rotation is determined by facing the front surface of the E-
Cam chain sprocket.
Move the ram to TDC (top dead center).
Mounting The jobber Plus
Determine where on the machine you want to mount the
jobber Plus
. Always mount the
control so that the control is easily accessible to the operator and easy to view the display.
Use the shock mounts supplied with the control.
Failure to shock mount the jobber Plus
will void the warranty!
Mounting brackets are available for both side mounting and for mounting from the rear of
the control.
E-Cam Installation
With the machine
positioned at TDC
install the E-CAM. Be certain that the drive chain and
sprockets are secure and aligned properly. Do NOT load the E-CAM drive shaft. There should
be some slack in the chain so that the bearings are not overloaded. The E-CAM is supplied
pre-wired from the factory with a 12 foot long cable and connectors (longer length cables are
available). Do not, under any circumstances remove the E-CAM cover or alter the wiring in
any way.
Doing so will void the warranty!
Connect the E-CAM cable to the control. Make
sure the connector on the E-Cam is tightened properly.
Installation Instructions
Содержание Jobber Plus
Страница 2: ......
Страница 4: ...Page 4 J o b b e r P l u s M T C C Notes...
Страница 18: ...Page 18 J o b b e r P l u s M T C C...
Страница 23: ...MTCC Jobber Plus P a g e 2 3 Notes...
Страница 24: ...Page 24 J o b b e r P l u s M T C C...