background image

16

OPERATION MANUAL

Fig. 4.1

4.3 MANUAL BACK GAUGE.

The back gauge consists of a left and right hand shafts fitted 

with a rack and pinion. Mounted on each shaft is a sliding 

block that slides along the rack shaft  carrying the back gauge. 

The racks are connected by a shaft and handwheel. When 

turning the hand wheel the back gauge is moved in and out. 

The shaft can also be used for adjusting the synchronizing of 

the two ends of the back gauge to keep them parallel.

The right rack shaft is fitted with a scale with graduations of 

0.5mm. When installing the machine for the first time or af-

ter grind ing the blade, you should carefully adjust the “zero” 

position, 

The two sliding blocks are fitted with clamping handles. After 

the adjustment of the gauge distance, re-clamp the handles.  

Digital Readout

Some machines are fitted with a digital readout on the back-

gauge (Fig.4.2). The adjustment can be set using the display. 

The display unit can be changed between inch or metric and 

allows for “Zero” to be selected in any position.

It also has a button (ABS) which allows a switch between 

absolute and incremental measurement.

E.G. First cut is at 100mm, and the second cut is at 400mm 

when ABS is pressed then the total of the two is displayed as 

“500”mm.

The digital display is attached to the right hand shaft and does 

not need to be reset as the scale can be “Zero” in any position.

After the adjustment of the gauge distance, re-clamp the 

handles. 

Fig. 4.2

4.4 COMMISSIONING CHECK LIST.

Before starting the machine the following checks must be carried out.

Installation and machine preparation has been performed according to the manuals instructions.

All grease nipple points have been lubricated.

Electrical earth fitted and power circuits, switches, and foot-pedal checked for any damage

Setup rear sensors

Check motor rotation. 

Test safety operation, E stop, rear sensors, stop button etc. 

Test all mechanical operation on the machine including blade and back gauge travel and limit  

         switch operation.

Test cut material and check quality of cut

Tools, equipment and personnel are clear of the machine.

Operation Manual on how to operate the machine has been read.

Page 16

Instructions Manual for MG-440 (S924A)

07/02/2018

Содержание MG-440

Страница 1: ...MECHANICAL GUILLOTINE OPERATION MANUAL Edition No MGG 1 Date of Issue 10 2016 Models MG 440 MG 840 Page 1 Instructions Manual for MG 440 S924A 07 02 2018...

Страница 2: ...O SERIAL NO DATE OF MANF Note This manual is only for your reference Owing to the continuous improvement of the machine changes may be made at any time without obligation or notice Please ensure the l...

Страница 3: ...ories 12 4 COMMISSIONING 4 1 Preparation of the Machine 13 4 2 Omrom E3z Safety Sensor Alignment 13 4 3 Manual Back Gauge 16 4 4 Commissioning Check List 16 5 OPERATION INSTRUCTION 5 1 Pre Operational...

Страница 4: ...50 Back Gauge Type Rack Pinion Rack Pinion Strokes per Minute 22 28 Dimensions Width mm Depth mm Height mm 1860 2210 1180 3124 2398 1290 Weight kgs 1440 2500 Main Motor 3 Phase 415 Volt 50Hz kW 4 7 5...

Страница 5: ...5 OPERATION MANUAL 1 3 OVERALL DRAWING Page 5 Instructions Manual for MG 440 S924A 07 02 2018...

Страница 6: ...can be used as a guide to identify workplace hazards and to reduce the risks of operating metal guillotines It is an unsafe practice for two people to work at a guillotine unless both operators are pr...

Страница 7: ...mpt to cut material beyond the capacity of the machine q Never attempt to cut rod strap or wire with this machine q Use correct lifting procedures when handling large sheets of material q Take extreme...

Страница 8: ...al control The foot pedal when pressed activates the beam and must be held in the de pressed position until the machine has completed its cut Release the foot pedal during the cutting operation and th...

Страница 9: ...ease take note of the sling angle and the loads that apply When the slings are at a 45 angle then each sling is carrying the equivalent of 50 of the load weight Fig 2 1 When the slings are at a 90 ang...

Страница 10: ...re and explosion is necessary The floor load where the machine is to be installed must be suitable for the weight of the machine 3 INSTALLATION 3 1 BASE FOUNDATION AND SECURING POINTS Before securing...

Страница 11: ...ine up so that it operates to optimum performance apply the following procedure After your guillotine has been anchored to a concrete slab floor it then needs to be leveled The leveling is performed u...

Страница 12: ...ce of the holes q Re tighten the screws Fig 3 3 3 4 ATTACHING THE ACCESSORIES q Bolt the support arms onto the feed table Ensure they are level and square to the table Fig 3 2 q Unpack and attach the...

Страница 13: ...setup instructions before starting the machine The safety circuit consists of a reset switch and two rear side guards each having 3 sensors Your ma chine will have a RED warning light on the main cont...

Страница 14: ...bottom on the guard The receivers are wired in series so No 1 receiver will have a green light on indicating it has power When it is correctly aligned with its sender the red green light will be on a...

Страница 15: ...otor and the safety circuit will have to be reset again Loosen the sender screws and angle the sender up until the receiver loses alignment Angle sender down until the receiver re aligns and then lose...

Страница 16: ...any position It also has a button ABS which allows a switch between absolute and incremental measurement E G First cut is at 100mm and the second cut is at 400mm when ABS is pressed then the total of...

Страница 17: ...ical box image C 6 If red light on control panel is off continue to step 7 7 Repeat steps 1 to 6 for each sensor 2 3 A Basic Control Light on Emergency Stop Check B Rear Guarding Sensors C Guard Reset...

Страница 18: ...5 6 1 Power ON Light 2 Illuminated Start Button 3 Electrics OFF 4 Continuous or Single cut 5 Emergency Stop 6 Rear Safety Guard 2 If all the safety checks have been done then press the Start button t...

Страница 19: ...imately 10 of the thickness of the material E G 1mm material 0 1mm Blade Gap 2mm material 0 2mm Blade Gap Adjusting the Blade Gap Step 1 Isolate the machine from the power supply and place a maintenan...

Страница 20: ...aft 6 Month Planned Maintenance Brass Bush for eccentric sleeve Daily Operator Shaft pin of the connecting rod Monthly Operator Gearbox 6 Month Planned Maintenance All Guards that protect against phys...

Страница 21: ...ZG 3 Grease 2 Guide surface of the blade beam Oil Gun 2 3 Back gauge gear Manually 2 4 Back gauge rack Manually 2 5 Connecting Rod shaft pin Manually 2 6 Copper bush for eccentric sleeve Oil gun 2 7...

Страница 22: ...t of the motor brake The air gap on the motor brake should be 0 3 0 4mm Step 1 Loosen the 3 bolts Step 2 Adjust the 3 nuts Make sure that the gap is the same all the way round Step 3 Tighten the 3 bol...

Страница 23: ...0 2mm with feeler gauge and then re calibrate the graduated dial ring to read 0 2mm Repeat both ends Graduated Dial ring has a locking screw nut that must be undone to adjust Graduated Dial ring has...

Страница 24: ...tment needs to be made Inch the beam until it reaches the top position Loosen the positioning screw and rotate the cam until the travel switch moving arm roller is in line with the highest part of the...

Страница 25: ...25 OPERATION MANUAL A ELECTRICAL DIAGRAM Page 25 Instructions Manual for MG 440 S924A 07 02 2018...

Страница 26: ...connecting 14 Use correct amperage extension cords Undersized extension cords overheat and lose power Replace extension cords if they become damaged 15 Keep machine well maintained Keep blades sharp a...

Страница 27: ...Any presence sensing safeguarding used must have regular Safety integrity tests and records kept These records must be kept for 5 years or for the life of the plant and be handed to any person that y...

Страница 28: ...ear gloves to prevent cuts from sharp material offcuts Secure support work material on table Isolate power to machine prior to any checks or maintenance Hands should be kept clear of moving parts and...

Отзывы: