Why is the fuel burning in the 
boilers with automatic 
feeding? 

It is due to bad feeding times. Blower settings are wrong. 

Adjust fuel feeding and/or the blower (see the setting table). 
Call the helpline. 

Why is there sinter on the 
burner? 

Sinter is made by excessive air infeed. 

Regulate the blower operation. 

What does alarm mean – 
excessive flue gas 
temperature ? 

Clean boiler means that the boiler's exchanger may be dirty. 
Flue gas temperature greater than 280

o

C. 

Clean the boiler's exchanger. 
Reduce fuel feed 
 

Why does the unburnt pellet 
fall into the ash tray? 

Because the pellet feeing rate or ventilation are too big. 

Lower the feeding by 2-3% and check for improvement, if necessary, repeat the procedure. 
Lower the ventilation by 2-3% and check for improvement, if necessary, repeat the procedure. 

What does the „feeder 
overheat” mean? 

The  overheated  feeder  can  mean  that  the  fuel  bin  door  is 
open. The seal under the bin is broken. The cleaning hatch seal 
is  broken.  The  seal  between  the  burner  and  feeder  pipe  is 
broken.  Loose  screws  on  the  connections  of  the  basket 
between the feeder and burner. 

Close the fuel bin door 
Replace the seal under the bin door. 
Replace the seal under the basket. 
Replace the seal. 
Tighten all the screws. 

What does the „boiler 
overheat” alarm mean? 

The  boiler  overheats  when  the  temperature  exceeds  90

o

(usually when the upper grate is in operation). 
The hold time is too short. 

Cool down the boiler, remove the fuel if necessary. 
Increase the hold time. 

What does the „fumes sensor 
damaged” alarm mean? 

It means that the fumes temperature has exceeded 250

o

C. 

The fumes temperature sensor is broken. 

Lower the fuel feeding. If the fuel is burnt on the burner and grate simultaniously, feed less fuel to the grate. 
Replace the fumes temperature sensor. 

Smoke coming from the boiler 
door. 

It means that there is no draught. 

Tighten wall in the connection between the flue pipe and the chimney. 
Check if the patency of the chimney, and its parameters are as recommended by the manufacturer. 
Seal the outlet of the boiler to the chimney vent, preventing the suction of cool air. 
If the chimney diameter is too small, you can install an extraction fan. 

There is water coming from 
the convection channels. 

The fuel used is wrong or the humidity is too high. 
Combustion temperature is too low. 
Too little air feed. 
Fumes throttle is closed. 
Controller is set incorrectly. 

Use fuel of proper energy value and humidity. 
Open the air throttle.  
Open the fumes throttle.  
Set the controller right. 

During the initial start-ups the 
boiler „sweats”. 

It is due to condensation. 

Heat the boiler above 80

o

C and keep this temperature for at least 6 hours. If necessary, repeat. 

Why is the fuel combustion so 
rapid? 

The chimney diameter is too big. 
Air flow is too high. 
Controller set is incorrect. 

Close the throttle on the flue. 
Check the sealant on the door. 
Regulate the airflow. Regulate the controller or call the helpline. 

What features does the 
microprocessor regulator 
have? 

The controller provides: 

 

automatic ignition 

 

weather control 

 

room control (room temperature) 

 

central tap water pump regulation 

 

clock regulation of the circulation pump, additional pump, 
burner (boiler operation time) 

 

extinguishing 

 

control via Lambda sensor. 

 

Содержание SEG BIO 100

Страница 1: ...ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01 SEG BIO OPERATION AND MAINTENANCE DOCUMENTATION...

Страница 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Страница 3: ...f inspection guarantee repair maintenance service 40 Conformity declaration WE UE 43 Warranty Card for the steel boilers central heating water boilers 45 Warranty claim 47 Start up report 49 List of t...

Страница 4: ...gy consisting of different plant or animal substances which have been biodegraded Its use is not limited within the legal system Pellet is a burning material that comes from the pressed wood waste mai...

Страница 5: ...dule pcs 1 Cooling coil for closed system with valve pcs 1 Documentation Unit Number of items Boiler maintenance and operation documentation pcs 1 Controller user s manual and warranty card pcs 1 Blow...

Страница 6: ...ning hatch 17 Ash pan cleanout 18 Cooling coil optional 19 Sleeve of STB sensor 20 Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit...

Страница 7: ...Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit 24 Ventilator 25 Sleeve of Feeder temp sensor 26 Ash drawer 27 Deflector 28 Swirl...

Страница 8: ...sor 20 Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit 24 Ventilator 25 Sleeve of Feeder temp sensor 26 Ash drawer 27 Deflector 28...

Страница 9: ...8 10 Basic dimentions of the boiler SEG BIO USER INSTALLER ATTENTION Feet are present on boilers from SEG BIO 14 to SEG BIO 38 Their height is 30 mm Schematic 10 1 Boiler dimentions SEG BIO...

Страница 10: ...910 1105 1160 1160 1110 1115 1215 F 350 360 410 410 535 545 695 G 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 H 3 4 3 4 3 4 3 4 3 4 3 4 3 4 I 180 180 180 180 220 220 220 J 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2...

Страница 11: ...working temperature C 95 95 95 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 5 5 5 Boiler efficiency 90 90 90 90 90 90 90 Single fuel load L 190 290 350 350 400 520 5...

Страница 12: ...with section 5 3 Table 7 of standard PN EN 303 5 2012 diameter 6 1 mm 8 1mm length 3 15 L 40 humidity 12 ash content 0 5 calorific value 17 MJ kg The fuel should be clean and not contain rocks pieces...

Страница 13: ...ast 1 15 of the floor surface half of the windows in the room should open the electrical lightining and electrical socket of max 24 V should also be located in the room inspection chamber that will al...

Страница 14: ...o ignite Wood cement boards beams fibreglass mineral insulation C1 difficult to ignite Beech wood oak wood plywood C2 normal combustibility Pine larch and spruce wood corck plank boards rubber floorin...

Страница 15: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 16 2 Connecting boilers to the heating system diagram Tab 16 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Страница 16: ...3 Room regulator 4 Mixer 5 Heater 6 Heating circle 7 Floor heating Schematic 16 4 Connecting the boiler to the heating system with Laddomat and buffer 8 Central heating pump CO 9 Hot tap water pump CW...

Страница 17: ...ressure tank unit because it needs power supply for its operation The exchanger that is installed in the water coat is connected to the cold water cable that flows through it only when the thermal val...

Страница 18: ...safety downpipe and a spill pipe and connected to it deaeration The diameter of the deaeration and spill pipe should be at least MM Boiler efficiency kW The most important requirements on the operati...

Страница 19: ...s circulation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for...

Страница 20: ...ype M4 regulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or...

Страница 21: ...r their housings should meet the requirements set in the small chimneys fire test Polish Norm It is allowed to build the housing from solid bricks of 12 cm thickness The bricks should be set on the ce...

Страница 22: ...possible to check their work The Manual work menu is used for this purpose To enter the manual work menu select the manual work icon and confirm Main menu To enter the main menu press the menu button...

Страница 23: ...nu and press ENTER to start it OFF will change to ON a Palnik rynnowy bio The picture shown here shows an empty feeder no starting fuel dose When the feeder is set to ON in the Manual work menu fuel w...

Страница 24: ...e screen The igniter s work is illustrated by the flame visible in the picture shown here The boiler is recognized as having been fired up successfully at the instant when flue gas temperature exceeds...

Страница 25: ...TION Do not stand in front of the boiler when opening the boiler door as you may run the risk of getting burn ATTENTION If the boiler is equipped with a Lambda sensor set its parameters with a fumes a...

Страница 26: ...the boiler electronic system or boiler construction is forbidden 24 Boiler maintenece and cleaning USER ATTENTION Clean the boiler only when it is disconnected from the power supply In order to save...

Страница 27: ...sealing Eye hole sealing Door sealing Feeder sealing Door handle Side sheet metal 1 pc Top shhet metal 1 pc Door 1 pc 27 Possible faults and malfunctions USER Before calling the helpline read the FAQ...

Страница 28: ...he central heating In this mode set the temperature on the boiler and the heating circulation Weather heating up the tap water and the central heating In this mode the controller calculates the set te...

Страница 29: ...ty is a controller feature that heats up the hot tap water vessel and then activates the central heating The feature is used in hot tap water consumpiton conditions What is hot tap water decontaminati...

Страница 30: ...es sensor damaged alarm mean It means that the fumes temperature has exceeded 250o C The fumes temperature sensor is broken Lower the fuel feeding If the fuel is burnt on the burner and grate simultan...

Страница 31: ...30 TROUGH BURNER...

Страница 32: ...e electric engine and the reducer The preformance is controlled by a microprocessor boiler controller The engine must be connected according to the schematics and the boiler controller manual In the l...

Страница 33: ...rner Schematics description 1 Burner 2 Chamotte block 3 Burner to boiler mounting plate 4 Steel spacer 5 Heat insulating spacer 6 Screw 7 Fuel bin sleeve 8 Pin 9 Pin cover 10 Motoreducer 11 Feeder sup...

Страница 34: ...led all the screws are tightened to prevent any loosing up put the plug into the socket located at the bottom of the boiler during installing the multi fuel burner secure the mounting plate with heat...

Страница 35: ...e motoreducer 10 Clean the element from any dirt and residues left by the locking screw 11 Insert a new protection element 12 Secure the screw with a nut 13 The protection element has been installed c...

Страница 36: ...unt the motoreducer with the screw by removing the safety pin to disconnect the screw from the motoreducer to prevent the elements mentioned above from seizure grease the screw pivot and the motoreduc...

Страница 37: ...stall the new ignition 6 Tighten all the screws and connect the power cable Check if the device works 38 Disposal of trough burner after its lifespan USER All the information about the disposal of the...

Страница 38: ...g decoupled from motoreducer Replace coupling insert and recouple the coupling Worm not cleaned before end of boiler work Remove the worm clean it notify the manufacturer Frequent shearing of wedge se...

Страница 39: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Страница 40: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Страница 41: ...40 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9 10...

Страница 42: ...41 11 12 13 14 15 16 17 18 19 20 21...

Страница 43: ...42...

Страница 44: ...rm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pressu...

Страница 45: ...44...

Страница 46: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Страница 47: ...46...

Страница 48: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Страница 49: ...48...

Страница 50: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Страница 51: ...20 Starting power Sustain power User s training certificate on YES NO Comments Start up date Boiler name Boiler power kW Serial number Training on safe operation of the boiler is included in chapter...

Страница 52: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Страница 53: ...20 Starting power Sustain power User s training certificate on YES NO Comments Start up date Boiler name Boiler power kW Serial number Training on safe operation of the boiler is included in chapter...

Страница 54: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Отзывы: