Metal-Fach SEG BIO 100 Скачать руководство пользователя страница 12

 

11 

12.

 

Control and safety 

(USER/INSTALLER) 

1)

 

Automatic control of the boiler can adjust: 

 

boiler temperature 

 

temperatury w obiegu centralnego ogrzewania C.O.1,C.O.2 ; 

 

hot water temperature 

 

room temperature 

 

temperature of return water from central heating (boiler exchanger protective feature) 

 

ignition time (depending on type of fuel) 

 

fuel feeder operation time 

 

feeder and vent manual control time 

 

automatic burner power modulation (fuzzy logic) 

 

automatic air feed (lambda sensor module) 

2)

 

Temperature sensor 
The STB mechanical protection is situated inside the boiler and prevent the heating system from 

overheating. it is set by default at 95

o

C. if temperature exceeds 95, the vent is turned off. at the same 

time central heating  hot water pumps come on and the mixer valve opens. 
3)

 

Fuzzy Logic control (advantages): 

 

advanced algorithm 

 

reduces fuel consuption and lowers the amount of sooth and contamination in the boiler 

 

enhanced  boiler  working  temperature  stability-  eliminates  condensation  in  the  boiler 
(sweating of the boiler) 

 

combustion chamber temperature is high and stable which lowers carbon oxides emission. 

4)

 

Lambda sensor 
The  sensor  continiously  adjusts  the  amount  of  air  in  order  to  provide  the  most  efficient 

operation of the boiler and minimise the carbon oxide emission under the given boiler load, fuel 
type and weather conditions. 
5)

 

Fumes temperature sensor 
The  sensor  is  situated  in  the  boiler  flue.  it  allows  to  control  the  fumes  temperature.  if  the 

temperature exceeds 250 oC, the vent automatically shuts down until the combustion temperature 
drops. 
6)

 

Mixing valve acutator x2 
With this device you can adjust the set heating circle temperature in the central heating system, 

keeping the constant boiler temperature. The temperature is calculated from the heating curve in 
relation to the outside temperature. 
 
 
 
 
 
 

13.

 

Fuel 

(USER) 

The default fuel of boilers equipped with a screw feeder or retort or BIO burner is: 

1)

 

Class C wood pellet compliant with section 5.3 (Table 7) of standard PN EN 303-5:2012:

 

 

diameter: 6 ± 1 mm; 8 ± 1mm; 

 

length:  3,15 ≤ L ≤ 40; 

 

humidity ≤ 12%; 

 

ash content ≤ 0,5%; 

 

calorific value >17 MJ / kg; 

The fuel should be clean and not contain rocks, pieces of wood etc. 
 

14.

 

Requirements for the boiler room and 
boiler installation 

(USER/INSTALLER) 

In Poland, all the soild fuels boilers should be made in accordance with PN- 87/B-02411 Norm 

„Soild fuels boilers”. The have been divided into two categories. 
1)

 

For small boilers under 25 kW, the following requirements should be met: 

 

the boiler should be placed in the central position to the heated rooms and in a seperate 
room. 

 

the floor surface should be inflammable. If the floor is flammable, it should be covered with 
steel metal sheet of 0,7 mm thickness and exceed the boiler contour by at least 50 cm. the 
boiler should be placed on inflammable base of 0,05 m above the floor and secured by steel 
angles. 

 

the boiler room can be lit naturally as well as artificially. 

 

the location of the boiler in the room should enable free access to the boiler during cleaning 
and maintenance works. The distance between the back of the boiler and a wall should be 
at least 70 cm, the side of the boiler and a wall should be at least 100 cm and the front of 
the boiler and a wall opposite should be at least 200 cm; 

 

the height in a new building should be at least 220 cm. in old buildings the the boiler room 
should be at least 190 cm high as long as the ventilation inside is sufficient (supply- exhaust 
ventilation) 

 

supply ventilation should be provided by an open slot of 200 cm2  in diameter and placed 
up to 100 cm over the floor surface. 

 

the exhaust ventilation should be provided by an exhaust duct  of 14 x 14 diameter and 
made from noncombustible material. Its outlet should be installed under the ceiling of the 
boiler room. The exhaust duct should lead out over the roof and placed in the close vicinity 
of the chimney. No shut down equipment can be installed on the duct. 

2)

 

Boiler rooms of heating power greater than 25kW should meet extra requirements, such 
as: 

 

the distance to the far-most chimney, at gravitional draught, cannot exceed 50 cm of the 
chimney height. 

Содержание SEG BIO 100

Страница 1: ...ENGLISH TRANSLATION OF THE ORIGINAL MANUAL ISSUE I 2018 04 01 SEG BIO OPERATION AND MAINTENANCE DOCUMENTATION...

Страница 2: ...rent norms and standards guaranteeing safety and dependable use Using the device in accordance with the provided manual ensures effective and dependable operation The boiler is not meant to be operate...

Страница 3: ...f inspection guarantee repair maintenance service 40 Conformity declaration WE UE 43 Warranty Card for the steel boilers central heating water boilers 45 Warranty claim 47 Start up report 49 List of t...

Страница 4: ...gy consisting of different plant or animal substances which have been biodegraded Its use is not limited within the legal system Pellet is a burning material that comes from the pressed wood waste mai...

Страница 5: ...dule pcs 1 Cooling coil for closed system with valve pcs 1 Documentation Unit Number of items Boiler maintenance and operation documentation pcs 1 Controller user s manual and warranty card pcs 1 Blow...

Страница 6: ...ning hatch 17 Ash pan cleanout 18 Cooling coil optional 19 Sleeve of STB sensor 20 Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit...

Страница 7: ...Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit 24 Ventilator 25 Sleeve of Feeder temp sensor 26 Ash drawer 27 Deflector 28 Swirl...

Страница 8: ...sor 20 Sleeve of boiler temp sensor 21 Sleeve of flue gas temp sensor 22 Lambda sensor case 23 Pressure equalization conduit 24 Ventilator 25 Sleeve of Feeder temp sensor 26 Ash drawer 27 Deflector 28...

Страница 9: ...8 10 Basic dimentions of the boiler SEG BIO USER INSTALLER ATTENTION Feet are present on boilers from SEG BIO 14 to SEG BIO 38 Their height is 30 mm Schematic 10 1 Boiler dimentions SEG BIO...

Страница 10: ...910 1105 1160 1160 1110 1115 1215 F 350 360 410 410 535 545 695 G 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2 H 3 4 3 4 3 4 3 4 3 4 3 4 3 4 I 180 180 180 180 220 220 220 J 1 1 2 1 1 2 1 1 2 1 1 2 1 1 2...

Страница 11: ...working temperature C 95 95 95 95 95 95 95 Test pressure bar 4 5 4 5 4 5 4 5 4 5 4 5 4 5 Boiler class 5 5 5 5 5 5 5 Boiler efficiency 90 90 90 90 90 90 90 Single fuel load L 190 290 350 350 400 520 5...

Страница 12: ...with section 5 3 Table 7 of standard PN EN 303 5 2012 diameter 6 1 mm 8 1mm length 3 15 L 40 humidity 12 ash content 0 5 calorific value 17 MJ kg The fuel should be clean and not contain rocks pieces...

Страница 13: ...ast 1 15 of the floor surface half of the windows in the room should open the electrical lightining and electrical socket of max 24 V should also be located in the room inspection chamber that will al...

Страница 14: ...o ignite Wood cement boards beams fibreglass mineral insulation C1 difficult to ignite Beech wood oak wood plywood C2 normal combustibility Pine larch and spruce wood corck plank boards rubber floorin...

Страница 15: ...l pipe RB Safety pipe T1 Temperature P1 Pressure Schematic 16 2 Connecting boilers to the heating system diagram Tab 16 2 Symbols applied in the schematics Designation Key T Temperature sensor Tk Boil...

Страница 16: ...3 Room regulator 4 Mixer 5 Heater 6 Heating circle 7 Floor heating Schematic 16 4 Connecting the boiler to the heating system with Laddomat and buffer 8 Central heating pump CO 9 Hot tap water pump CW...

Страница 17: ...ressure tank unit because it needs power supply for its operation The exchanger that is installed in the water coat is connected to the cold water cable that flows through it only when the thermal val...

Страница 18: ...safety downpipe and a spill pipe and connected to it deaeration The diameter of the deaeration and spill pipe should be at least MM Boiler efficiency kW The most important requirements on the operati...

Страница 19: ...s circulation BH upper CT4 buffer temp sensor BL lower CT4 buffer temp sensor WS CT6 P weather temperature sensor FT CT2S flue gas temp sensor TR universal thermostat of mixer open close H outlet for...

Страница 20: ...ype M4 regulated circuit temperature sensor mixer 4 CT4 type RM3 mixer 3 room thermostat RM4 mixer 4 room thermostat FS BU feeder fuel level sensor H2 outlet to the back up boiler control or alarm or...

Страница 21: ...r their housings should meet the requirements set in the small chimneys fire test Polish Norm It is allowed to build the housing from solid bricks of 12 cm thickness The bricks should be set on the ce...

Страница 22: ...possible to check their work The Manual work menu is used for this purpose To enter the manual work menu select the manual work icon and confirm Main menu To enter the main menu press the menu button...

Страница 23: ...nu and press ENTER to start it OFF will change to ON a Palnik rynnowy bio The picture shown here shows an empty feeder no starting fuel dose When the feeder is set to ON in the Manual work menu fuel w...

Страница 24: ...e screen The igniter s work is illustrated by the flame visible in the picture shown here The boiler is recognized as having been fired up successfully at the instant when flue gas temperature exceeds...

Страница 25: ...TION Do not stand in front of the boiler when opening the boiler door as you may run the risk of getting burn ATTENTION If the boiler is equipped with a Lambda sensor set its parameters with a fumes a...

Страница 26: ...the boiler electronic system or boiler construction is forbidden 24 Boiler maintenece and cleaning USER ATTENTION Clean the boiler only when it is disconnected from the power supply In order to save...

Страница 27: ...sealing Eye hole sealing Door sealing Feeder sealing Door handle Side sheet metal 1 pc Top shhet metal 1 pc Door 1 pc 27 Possible faults and malfunctions USER Before calling the helpline read the FAQ...

Страница 28: ...he central heating In this mode set the temperature on the boiler and the heating circulation Weather heating up the tap water and the central heating In this mode the controller calculates the set te...

Страница 29: ...ty is a controller feature that heats up the hot tap water vessel and then activates the central heating The feature is used in hot tap water consumpiton conditions What is hot tap water decontaminati...

Страница 30: ...es sensor damaged alarm mean It means that the fumes temperature has exceeded 250o C The fumes temperature sensor is broken Lower the fuel feeding If the fuel is burnt on the burner and grate simultan...

Страница 31: ...30 TROUGH BURNER...

Страница 32: ...e electric engine and the reducer The preformance is controlled by a microprocessor boiler controller The engine must be connected according to the schematics and the boiler controller manual In the l...

Страница 33: ...rner Schematics description 1 Burner 2 Chamotte block 3 Burner to boiler mounting plate 4 Steel spacer 5 Heat insulating spacer 6 Screw 7 Fuel bin sleeve 8 Pin 9 Pin cover 10 Motoreducer 11 Feeder sup...

Страница 34: ...led all the screws are tightened to prevent any loosing up put the plug into the socket located at the bottom of the boiler during installing the multi fuel burner secure the mounting plate with heat...

Страница 35: ...e motoreducer 10 Clean the element from any dirt and residues left by the locking screw 11 Insert a new protection element 12 Secure the screw with a nut 13 The protection element has been installed c...

Страница 36: ...unt the motoreducer with the screw by removing the safety pin to disconnect the screw from the motoreducer to prevent the elements mentioned above from seizure grease the screw pivot and the motoreduc...

Страница 37: ...stall the new ignition 6 Tighten all the screws and connect the power cable Check if the device works 38 Disposal of trough burner after its lifespan USER All the information about the disposal of the...

Страница 38: ...g decoupled from motoreducer Replace coupling insert and recouple the coupling Worm not cleaned before end of boiler work Remove the worm clean it notify the manufacturer Frequent shearing of wedge se...

Страница 39: ...e guidelines given in the appliance s Operation and Maintenance Documentation 5 Performance of first boiler start up within 6 months from the date of the appliance s installation by the fitter in acco...

Страница 40: ...y a specialized company indicated by the Guarantor 6 Performance of the obligations arising from the guarantee will occur within 14 work days counting from the date on which the appliance is made avai...

Страница 41: ...40 Confirmation of performance of inspection guarantee repair maintenance service Item no Date of performance Description of performed activities Contractor s signature and seal 1 2 3 4 5 6 7 8 9 10...

Страница 42: ...41 11 12 13 14 15 16 17 18 19 20 21...

Страница 43: ...42...

Страница 44: ...rm PN EN ISO 12100 2012 Safety of machinery Basic concepts principles for design part 1 Basic terminology Methodology 3 Norm PN EN 1708 1 2010 Welding Basic welded joint details in steel Part 1 Pressu...

Страница 45: ...44...

Страница 46: ...ms pursuant to the act of 29 August 1997 on personal data protection consolidated text Journal of Laws of 2014 item 1182 The User has the right to access their personal data correct them demand cessat...

Страница 47: ...46...

Страница 48: ...ty in accordance with the Personal Data Protection Act dated 29 08 1997 Dz Ust No 133 item 883 legible signature of Purchaser The Producer is obligated to take warranty actions within 14 days from rec...

Страница 49: ...48...

Страница 50: ...is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feeder and boiler S...

Страница 51: ...20 Starting power Sustain power User s training certificate on YES NO Comments Start up date Boiler name Boiler power kW Serial number Training on safe operation of the boiler is included in chapter...

Страница 52: ...screw rotation is correct Boiler start up Valid Invalid Comments The hydraulic connection to the system is tight Fireman Stra ak system test if installed Checking the connection between the fuel feed...

Страница 53: ...20 Starting power Sustain power User s training certificate on YES NO Comments Start up date Boiler name Boiler power kW Serial number Training on safe operation of the boiler is included in chapter...

Страница 54: ...METAL FACH JACEK KUCHAREWICZ UL SIKORSKIEGO 66 16 100 SOK KA TEL 48 85 711 94 54 WWW METALFACH COM PL SERVICE INFOLINE CALL US 48 663 453 222 WRITE TO US p czepiel metalfach com pl...

Отзывы: