
18
Schematic 19.1 Electrical schematics for connecting the boiler– controller GOLD II and PLATINUM.
Electrical connection diagram of regulator:
Panel - control panel, and additionally, ecoSTER200/ecoSTER TOUCH room panel, λ - Lambda sensor module, B - module for support of additional heating circulations, BT – CT4 boiler temperature sensor, FS
– CT4 fuel feeder temperature sensor, CWU – domestic hot water temp. sensor, RS - CT4 return water temp. sensor, M1/M2 – CT4 temp. sensor of regulated mixer’s circulation, BH- upper CT4 buffer temp.
sensor, BL- lower CT4 buffer temp. sensor, WS- CT6-P weather temperature sensor, FT- CT2S flue gas temp. sensor, TR- universal thermostat of mixer (open-close), H- outlet for control of back-up boiler or
signaling of alarms, RE- relay (12V, max 80mA) for connection of back-up boiler/alarm, DS- inlet to fuel dispenser cover flap or door opening sensor, RMP- inlet of RPM sensor, L N PE- 230V~ grid power supply,
GR – earthing strip, STB – inlet to safety temp. limiter, PO – main feeder, W- fan, PM- domestic hot water circulating pump, PCO- boiler pump charging the buffer, IG- igniter, PCW- domestic hot water pump,
SM1/SM2- mixer’s actuator, PM1/PM2- mixer’s pump, CPU- control
Содержание SEG BIO 100
Страница 31: ...30 TROUGH BURNER...
Страница 42: ...41 11 12 13 14 15 16 17 18 19 20 21...
Страница 43: ...42...
Страница 45: ...44...
Страница 47: ...46...
Страница 49: ...48...