
19
Schematic 19.2 Electrical schematics for connecting the boiler – additional B MODULE.
Schematics of electric connections – additional B MODULE,
where
M3- regulated circuit temperature sensor (mixer 3) CT4 type
M4- regulated circuit temperature sensor (mixer 4) CT4 type
RM3 - mixer 3 room thermostat
RM4 - mixer 4 room thermostat
FS - BU feeder fuel level sensor
H2- outlet to the back-up boiler control or alarm or hot tap water
circulation pump
Relay
L N PE- power supply 230V~
P/M ¾ - mixer pump
SM ¾ - mixer servo
BU - The fuel tank from the bunker to the tank in the boiler
CPU- control
A - ecoMAX 860P2-T controller, module A
Содержание SEG BIO 100
Страница 31: ...30 TROUGH BURNER...
Страница 42: ...41 11 12 13 14 15 16 17 18 19 20 21...
Страница 43: ...42...
Страница 45: ...44...
Страница 47: ...46...
Страница 49: ...48...