![MES SQA-V Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/mes/sqa-v/sqa-v_service-manual_1775133042.webp)
and
SQA-V
Service Manual Dec_2019
42
Appendix 2:
Loading
I-Button
Tests
How to Load the I-button
Applies to: ALL SQA-V (V, Vb, Ve, Vp and Vt) with new I-button clip hardware
Issue date: January 22, 2020
Instructions:
Procedure for LOADING THE I-BUTTON:
1.
Turn on the SQA-V and the V-Sperm Computer
2.
From the SQA-V go to: MAIN MENU > SERVICE > ADD I-BUTTON TESTS
3.
Insert the I-button card (with the
I- button attached to it) into the
I-button port of the SQA:
The back of the card
(instructions side) should be
facing up so that the clip
touches the I- button through
the round hole at the back of
the card (See Fig. 1).
The I-button should be placed
snugly into the port and held
firmly in place by the clip (See
Fig. 2).
There is no need to hold the
I-button or the card during the
loading process – the clip will do
this.
Figure 1:
I-button insertion
Figure 2:
Final location of the I-button inside
the port
4.
When the button is in place, go to
V-Sperm
(or B-Sperm, or E-
Sperm, etc.) and click:
CONTINUE
(See Fig. 3)
Figure 3:
Click “Continue”
I- button
clip touches
the I- button