It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 14
Please retain product label and instructions for future reference
V15
V14
V16
V13
Step 5
Parts needed - No. V13 QTY 2
No. V14 QTY 2
No. V15 QTY 2
No. V16 QTY 4
Place the first strip (
No. V13
) on
top of the veranda sides.
Following the same method
outlined in
Step 4
, measure
around the protruding log board
and mark the measurements onto
the strip, once marked cut the
corresponding notches and place
back into position.
Arrange the remaining strips
(
V14, V15 & V16
) around the
veranda as shown in the
illustration and secure using
30mm screws, ensuring there is
an equal amount of overhang
either side.
28x30mm Screws
30mm
screw
Pre drill
hole
*
Cut to fit
IMPORTANT:
Pre-drill before fixing screws.
V12
Step 6
Parts needed - No V12 QTY 1
Place the veranda floor strip (
No. V12
)
in between the the end of the floor
boards and bearers. Once in position
secure the floor strip using 4x30mm
screws, making sure to screw into the
bearer below.
4x30mm Screws
30mm
screw
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.