P 14
Please retain product label and instructions for future reference
V3
V9
V8
IMPORTANT:
Pre-drill before fixing screws.
V3
V10
V6
V4
V5
V6
V7
Step 4
Parts needed - No. V11 QTY 39
Lay the veranda floor boards
(
No. V11
) onto the bearers.
Either side of the opening the
boards will need to be notched
to fit around the log boards.
Measure around the protruding
log boards as shown in the
illustration and mark onto the
floor boards.
Once marked, cut into the floor
boards to create the desired notch
and place the board back into
position.
After positioning each board fix
the floor to the bearers below
using 40mm screws.
195x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
V11
IMPORTANT:
Pre-drill before fixing screws.
P 13
Step 3
Parts needed - No. V3 QTY 4
No. V4 QTY 4
No. V5 QTY 2
No. V6 QTY 20
No. V7 QTY 8
No. V8 QTY 2
No. V9 QTY 2
No. V10 QTY 2
Build up the walls of veranda
following the same method used
in the assembly of your building
(
See Pre-Assembly)
.
Place the boards (
No’s. V3, V4,
V5, V6, V7, V8, V9 & V10
) onto
the bearers and secure through
the notches using 70mm screws.
Then using 5x50mm screws at
either end of the building, secure
the veranda screwing through
the boards.
36x70mm Screws
10x50mm Screws
Pre drill
hole
70mm
screw
50mm
screw