P 5
Please retain product label and instructions for future reference
9
5
5
Step 4
(See Pre-Assembly)
Parts needed - No. 5 QTY 8
No. 6 QTY 8
No. 9 QTY 4
Following the same method
outlined in
Pre-Assembly
, lay
the first 4 boards (
No’s. 5, 6 &
9)
onto the starter boards to
create your first level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
Please Note:
The short boards at the
front of the building (either side of
the door and window opening’s)
can be placed either side depending
on your needs.
IMPORTANT:
Pre-drill before fixing screws.
5
5
6
6
9
Step 5
(See Pre-Assembly)
Parts needed - No. 5 QTY 14
No. 7 QTY 14
No. 8 QTY 14
No. 9 QTY 7
Following the same method
outlined in
Pre-Assembly
, lay
the next 6 boards (
No’s. 5, 7, 8
& 9)
onto the assembly to
create your second level.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame by 12-13 boards,
refer to door installation
instructions, if not, you can
install the door at step 8.
8
8
7
7