background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

P 12

Please retain product label and instructions for future reference

             

*If you have purchased either 06LOG236SG-V1 or 06LOG236DG-V1 do not treat your building

until you have finished constructing the veranda section (

See Steps V1 to V5

).

Veranda Steps: 

0628LOG236-V3 only

Pre drill 

hole

70mm 

screw

Step 1

Parts needed - No. V1 QTY 2 

 

 

No. V2 QTY 5

Following the same method

outlined in Step 1, lay the 

bearers (

No’s. V1 & V2

) onto a 

firm and level surface (

free from 

areas where standing water can 

collect

) as shown in the 

illustration and fix into place

using 70mm screws.

20x70mm Screws 

V2

V1

V2

V2

V2

V2

V1

V2

V2

V1

IMPORTANT: 

Pre-drill before fixing screws.

Pre drill 

hole

70mm 

screw

Step 2 

Parts needed - No. V1 QTY 2

 

 

No. V2 QTY 5

Repeat 

Step V1

 to create the 

second half of your base using

the remaining framing (

No’s V1 

& V2

).

Once both sections are built 

place the two halves together 

and secure using 70mm screws,

ensuring to stagger the screws 

to avoid colliding.

Then place against your 

building making sure it is level 

at either side and fix using 

4x70mm screws screwing 

through the bearers.

28x70mm Screws 

IMPORTANT: 

Pre-drill before fixing screws.

Содержание 0628LOG233-V4

Страница 1: ...d that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building...

Страница 2: ...6mm QTY 38 LB28 A 2996 Log Board 28x120x1715mm QTY 8 LB28 B 1715 Log Board 28x120x485mm QTY 28 LB28 B 485 Log Board 28x120x485mm QTY 28 LB28 C 485 Log Board 28x120x5000mm QTY 19 LB28 A 5000 Log Board...

Страница 3: ...717 Starter Board 28x120x1717mm QTY 2 LB28RT66 A 1717 Log Board 28x120x300mm QTY 20 LB28 B 300 Log Board 28x120x300mm QTY 8 LB28 C 300 Log Board 28x110x1000mm QTY 2 LB28RG110 B 1000 Log Board 28x54x17...

Страница 4: ...ing 2x70mm screws for each side of the bearer ensuring the framing remains level 32x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 14 QTY 2 No 15 QTY 10 Following the same method outline...

Страница 5: ...ing either side of the door and window opening s can be placed either side depending on your needs IMPORTANT Pre drill before fixing screws 5 5 6 6 9 Step 5 See Pre Assembly Parts needed No 5 QTY 14 N...

Страница 6: ...ons for future reference Step 6 See Window Assembly Parts needed No 1 QTY 2 Refer to window assembly instructions to assemble windows Step 7 Parts needed No 1 QTY 2 Ensure that the lip of the window f...

Страница 7: ...e Assembly lay the last two boards No s 8 11 onto the front of the assembly Once in position place the last 2 log board s No 10 onto the plain sides fixing into position by screwing through the notche...

Страница 8: ...nce in position fix to each purlin using 4x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the provided spacers and place a space of 2mm to ensure every roo...

Страница 9: ...ng flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board DoNOTsecure the boards until the last board has been measured and cut F...

Страница 10: ...nal space 21 21 Pre drill hole 30mm screw trim to fit Step 15 Parts needed No 21 QTY 6 Inside the building place the closure trim No 21 against the boarding and align with the roof as shown in the ill...

Страница 11: ...e 40mm screw 70mm bolt Step 19 Parts needed No 20 QTY 8 Arrange the storm braces No 20 around the building internally Place 2x storm braces per side fixing into place using 2x 70mm bolts per brace mak...

Страница 12: ...firm and level surface free from areas where standing water can collect as shown in the illustration and fix into place using 70mm screws 20x70mm Screws V2 V1 V2 V2 V2 V2 V1 V2 V2 V1 IMPORTANT Pre dr...

Страница 13: ...k into position After positioning each board fix the floor to the bearers below using 40mm screws 195x40mm Screws 40mm screw Pre drill hole Cut to fit V11 IMPORTANT Pre drill before fixing screws P 13...

Страница 14: ...rked cut the corresponding notches and place back into position Arrange the remaining strips V14 V15 V16 around the veranda as shown in the illustration and secure using 30mm screws ensuring there is...

Отзывы: