It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 12
Please retain product label and instructions for future reference
*If you have purchased either 06LOG236SG-V1 or 06LOG236DG-V1 do not treat your building
until you have finished constructing the veranda section (
See Steps V1 to V5
).
Veranda Steps:
0628LOG236-V3 only
Pre drill
hole
70mm
screw
Step 1
Parts needed - No. V1 QTY 2
No. V2 QTY 5
Following the same method
outlined in Step 1, lay the
bearers (
No’s. V1 & V2
) onto a
firm and level surface (
free from
areas where standing water can
collect
) as shown in the
illustration and fix into place
using 70mm screws.
20x70mm Screws
V2
V1
V2
V2
V2
V2
V1
V2
V2
V1
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
70mm
screw
Step 2
Parts needed - No. V1 QTY 2
No. V2 QTY 5
Repeat
Step V1
to create the
second half of your base using
the remaining framing (
No’s V1
& V2
).
Once both sections are built
place the two halves together
and secure using 70mm screws,
ensuring to stagger the screws
to avoid colliding.
Then place against your
building making sure it is level
at either side and fix using
4x70mm screws screwing
through the bearers.
28x70mm Screws
IMPORTANT:
Pre-drill before fixing screws.