Please retain product label and instructions for future reference
9
5
5
Step 8
(See Pre-Assembly)
Parts needed - No. 5 QTY 14
No. 7 QTY 14
No. 8 QTY 14
No. 9 QTY 7
Following the same method
outlined in
Pre-Assembly
, lay
the remaining boards (
No’s. 5,
7, 8, & 9
) onto the assembly
to bring the board level to the
top of the window and door
frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
9
10
10
11
3
3
Step 9
(See Pre-Assembly)
Parts needed - No. 9 QTY 1
No. 10 QTY 2
No. 11 QTY 1
Following the same method
outlined in
Pre-Assembly
, lay
the last two boards (
No’s. 8 &
11
)
onto the front of the
assembly. Once in position
place the last 2 log board’s
(
No. 10
) onto the plain sides,
fixing into position by
screwing through the
notches as shown in the
illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
Step 10
(See Pre-Assembly)
Parts needed - No. 3 QTY 2
Place the gable tops
(No. 3)
onto the assembly. Fix into
position by screwing
through the notches as
shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
P 7
8
8
7
7