background image

P 1

01OVLPRA1006SDFW-V1

10X6 OVERLAP REVERSE APEX SHED

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or 

extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment 

to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  

The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap 

the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding 

ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for you specific product code

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Содержание 01OVLPRA1006SDFW-V1

Страница 1: ...oon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins Are supplied untreated ...

Страница 2: ...TY 2 AI 01OVLPPS1800X620 V1 7 8 9 11 12 13 10 Ridge Bar 27x70x1462mm QTY 2 F2770 1462mm Cover Trim 12x45x1800mm QTY 6 S1245 1800mm Door Strip 12x28x1590mm QTY 2 S1228 1590mm Eaves Frame 28x28x1502mm QTY 4 F2828 1502mm Fascia 12x60x1016mm QTY 4 S1260 1016mm Finial QTY 2 DIAMOND SHED FINIAL Truss Frame 27x44x932mm QTY 2 F2744 932mm Truss Support Bar 27x44x450mm QTY 1 F2744 450mm Truss Block 27x44x14...

Страница 3: ... screws 30mm screw Pre drill hole 1 5 19 Step 1 4 4 12x30mm Screws Place floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Attach the floors using 12 x 30mm screws 30mm screw Pre drill hole Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Pos...

Страница 4: ...re drill hole Step 5 i Position a truss frame to the ridge bar sloping down towards the building side ensure it is central to the ridge bar Fix with a 50mm screw through the ridge bar into the truss frame ii Align the second truss frame with the first on the opposite side of the ridge bar and fix with a 50mm screw at an angle as illustrated ENSURE SUPPORT BARS ARE MANUALLY SUP PORTED UNTIL FIXED A...

Страница 5: ...een the two truss frames and fix in place using 40mm screws ensure you pre drill holes before fixing together 4x40mm Screws 40mm screw Pre drill hole 10 10 Step 9 Place two roof sheets on top of the plain gable and truss Before fixing the roof sheet to the truss frame make sure the edge of the roof sheet sits in the middle of the truss frame then fix using 40mm screws Fix the remaining two roof sh...

Страница 6: ...n using 30mm screws Trim the length of the cover trims to the required size before fitting if necessary Pre drill to avoid splitting 18x30mm Screws Step 12 16 16 30mm screw Pre drill hole 16 16 16 16 Step 13 16x40mm Screws Attach the fascias to the sides of the building leaving a slight overhang at the top Fit the fascias to the building over the felt and secure in place with 40mm screws ensuring ...

Страница 7: ...outside of the door into the block 10x30mm Screws Pre drill hole 30mm screw 30mm screw 17 13 Pre drill hole Step 15 Fix the pad bolt with 6x30mm screws to the horizontal brace on the door Then fix the pad bolt retainer to the door panel framing using 4x30mm screws Fix the turn buttons using 1x30mm black screw per turn button 22 30mm screw 20 30mm screw 2x 30mm Black Screw 10x 30mm Screw It is ESSE...

Отзывы: