P 4
Please retain product label and instructions for future reference
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Step 3
13x50mm Screws
Fix the corners with 50mm
screws as shown in diagram.
Pre drill
hole
50mm
screw
1
3
6
Step 4
23
8
8
21
21
Ridge Bar Assembly
Position the two parts of the
ridge bar within the ‘U’
channel and secure from
either side with 3 x 30mm
screws and 4 x 30mm screws
from underneath. Secure an
‘L’ bracket to either end of
the ridge bar using 2 x
30mm screws per bracket.
18x30mm Screws
Place the roof support bar
in between the front and
back panels. Ensure the top
corners of the support bar
are flush with each top
point. Secure in place using
the L Bracket on each end
with 4x30mm screws.
30mm
screw
Pre drill
hole
Step 5
i)Position a truss frame to the
ridge bar sloping down towards
the building side, ensure it is
central to the ridge bar. Fix with a
50mm screw through the ridge
bar into the truss frame.
ii) Align the second truss frame
with the first on the opposite side
of the ridge bar and fix with a
50mm screw at an angle as
illustrated.
ENSURE SUPPORT BARS
ARE MANUALLY SUP-
PORTED UNTIL FIXED AT
BOTH ENDS
i
ii
4x50mm Screws
Pre drill
hole
50mm
screw
9
9
*Ensure the truss frames are placed centrally with an
equal distance either side of the joint in the ridge bar.
Step 6
Fix a panel block on both sides of
the building positioned central to
the truss frame and flush with the
underneath of the panels fram-
ing. Screw through the ouside of
the building through the clad-
ding into the panel block using 2x
30mm screw per block.
4x30mm Screws
Pre drill
hole
14
14
14
30mm
screw