P 6
24
Step 11
Cut the felt into 3104mm long sheets and
lay onto roof as shown in diagram ensur-
ing there is overhang around the sides.
HANDLE
WITH CARE
1
2
3
4
Felt
tacks
24
130x Tacks
Fit the Cover Trims to the left
and right of the building and
over the panel joins as shown
in the illustration using 30mm
screws. Trim the length of the
cover trims to the required
size before fitting if necessary.
Pre drill to avoid splitting.
18x30mm Screws
Step 12
16
16
30mm
screw
Pre drill
hole
16
16
16
16
Step 13
16x40mm Screws
Attach the fascias to the sides of
the building leaving a slight
overhang at the top.
Fit the fascias to the building
over the felt and secure in place
with 40mm screws, ensuring
the screws go through into the
gable framing. as shown.
Pre drill
hole
15
40mm
screw
15
18
18
15
15