background image

P 7

Please retain product label and instructions for future reference

             

14

Step 14

Use 4x30mm screws to fix 

each beading strip onto the 

door panel. Ensure that the 

screw is parallel with the 

door frame when fixing the 

strip to the door panel as 

shown in the close up view.

Line up the door block as 

shown in the illustration. 

Then fix with 2x30mm 

screws by screwing through 

the outside of the door  into 

the block.

10x30mm Screws

Pre drill 

hole

30mm 

screw

30mm 

screw

17

13

Pre drill 

hole

Step 15

Fix the pad bolt with 6x30mm 

screws to the horizontal brace 

on the door. Then fix the pad 

bolt retainer to the door panel 

framing using 4x30mm screws.

Fix the turn buttons using 

1x30mm black screw per turn 

button.

22

30mm 

screw

20

30mm 

screw

2x 30mm Black Screw

10x 30mm Screw

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Содержание 01OVLPRA1006SDFW-V1

Страница 1: ...oon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings Require a waterproof treatment to prevent water ingress Log Cabins Are supplied untreated ...

Страница 2: ...TY 2 AI 01OVLPPS1800X620 V1 7 8 9 11 12 13 10 Ridge Bar 27x70x1462mm QTY 2 F2770 1462mm Cover Trim 12x45x1800mm QTY 6 S1245 1800mm Door Strip 12x28x1590mm QTY 2 S1228 1590mm Eaves Frame 28x28x1502mm QTY 4 F2828 1502mm Fascia 12x60x1016mm QTY 4 S1260 1016mm Finial QTY 2 DIAMOND SHED FINIAL Truss Frame 27x44x932mm QTY 2 F2744 932mm Truss Support Bar 27x44x450mm QTY 1 F2744 450mm Truss Block 27x44x14...

Страница 3: ... screws 30mm screw Pre drill hole 1 5 19 Step 1 4 4 12x30mm Screws Place floor on firm and level base ensure base has suitable drainage free from areas where water can collect See front page on base requirements Attach the floors using 12 x 30mm screws 30mm screw Pre drill hole Do not secure the building to the floor until the roof is fitted Fix the corners with 50mm screws as shown in diagram Pos...

Страница 4: ...re drill hole Step 5 i Position a truss frame to the ridge bar sloping down towards the building side ensure it is central to the ridge bar Fix with a 50mm screw through the ridge bar into the truss frame ii Align the second truss frame with the first on the opposite side of the ridge bar and fix with a 50mm screw at an angle as illustrated ENSURE SUPPORT BARS ARE MANUALLY SUP PORTED UNTIL FIXED A...

Страница 5: ...een the two truss frames and fix in place using 40mm screws ensure you pre drill holes before fixing together 4x40mm Screws 40mm screw Pre drill hole 10 10 Step 9 Place two roof sheets on top of the plain gable and truss Before fixing the roof sheet to the truss frame make sure the edge of the roof sheet sits in the middle of the truss frame then fix using 40mm screws Fix the remaining two roof sh...

Страница 6: ...n using 30mm screws Trim the length of the cover trims to the required size before fitting if necessary Pre drill to avoid splitting 18x30mm Screws Step 12 16 16 30mm screw Pre drill hole 16 16 16 16 Step 13 16x40mm Screws Attach the fascias to the sides of the building leaving a slight overhang at the top Fit the fascias to the building over the felt and secure in place with 40mm screws ensuring ...

Страница 7: ...outside of the door into the block 10x30mm Screws Pre drill hole 30mm screw 30mm screw 17 13 Pre drill hole Step 15 Fix the pad bolt with 6x30mm screws to the horizontal brace on the door Then fix the pad bolt retainer to the door panel framing using 4x30mm screws Fix the turn buttons using 1x30mm black screw per turn button 22 30mm screw 20 30mm screw 2x 30mm Black Screw 10x 30mm Screw It is ESSE...

Отзывы: