Unit Maintenance
MPQ2000-UG-EN Rev 8 October 2018
85
5.
Carefully lift on the front panel handle to lift the front panel from its enclosure,
as shown below. (Do not pass 90 degrees. If so, the current PCB ribbon cable
will disconnect.)
6.
Remove the 3 screws holding the battery cover in place.
7.
Remove the battery cover.
8.
Grasp the wires between the battery and the connector and pull straight up until
the connector unplugs from the MPQ2000.
9.
Connect a new battery to the MPQ2000 by aligning the battery connector to the
pins and pressing it in place.
10.
Place the battery in the battery compartment with the wires under it.
Содержание PQ2000
Страница 2: ......
Страница 3: ...MPQ2000 PQ Analyzer...
Страница 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Страница 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Страница 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Страница 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Страница 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Страница 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Страница 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...
Страница 50: ...M MPQ2000 UG EN Rev 8 October 2018 44 IA V ROTATION N A VA IA LOAD 2 WIRE SINGLE PHASE SINGLE WATTMETER...
Страница 52: ...M MPQ2000 UG EN Rev 8 October 2018 46 VAC VBC LOAD IA IB 3 WIRE DELTA CONNECTION 2 WATTMETER METHOD B C A...
Страница 54: ...M MPQ2000 UG EN Rev 8 October 2018 48 VAN VBN IA IB LOAD 3 WIRE NETWORK METER B N A ROTATION ABC ROTATION ACB...
Страница 88: ...M MPQ2000 UG EN Rev 8 October 2018 82 M...
Страница 94: ...M MPQ2000 UG EN Rev 8 October 2018 88 M...