M
MPQ2000-UG-EN Rev 8 October 2018
60
Starting a Recording
Once the connections are verified, press the RECORD button to start the recording.
The analyzer will verify the inputs and settings before starting the recording. The
analyzer will verify the following:
The default frequency is correct.
The inputs are correct for the power parameters selected.
The current clamps are set to the proper range.
The phase angles are correct for the configuration selected.
If any of the above is found to be incorrect the analyzer will display a message. The
message will indicate what parameters and channel is incorrect and how to correct it.
NOTE:
If the range setting on the CT does not match the range in the setup file then
the analyzer will display a message indicating the CT channel that is set
incorrectly.
Содержание PQ2000
Страница 2: ......
Страница 3: ...MPQ2000 PQ Analyzer...
Страница 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Страница 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Страница 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Страница 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Страница 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Страница 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Страница 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...
Страница 50: ...M MPQ2000 UG EN Rev 8 October 2018 44 IA V ROTATION N A VA IA LOAD 2 WIRE SINGLE PHASE SINGLE WATTMETER...
Страница 52: ...M MPQ2000 UG EN Rev 8 October 2018 46 VAC VBC LOAD IA IB 3 WIRE DELTA CONNECTION 2 WATTMETER METHOD B C A...
Страница 54: ...M MPQ2000 UG EN Rev 8 October 2018 48 VAN VBN IA IB LOAD 3 WIRE NETWORK METER B N A ROTATION ABC ROTATION ACB...
Страница 88: ...M MPQ2000 UG EN Rev 8 October 2018 82 M...
Страница 94: ...M MPQ2000 UG EN Rev 8 October 2018 88 M...