Installing the MPQ2000 PQ Analyzer
MPQ2000-UG-EN Rev 8 October 2018
41
(110V-240VAC 50Hz/60Hz). The AUX / Va Power Switch must be set to AUX to
power the unit off of the Phase A voltage.
NOTE:
If Phase A is connected to a voltage in excess of 600V AC/DC and the
AUX / Va power switch is set to Va then damage may occur to the
MPQ2000 power supply PCB.
Voltage and Current Connections
If you will not be recording demand parameters, voltage and current can be
connected to any input. The connections do not have to be in pairs, but the voltage
channels and current channels must be sequenced.
NOTE:
Current probes not purchased from Megger require Megger adapters.
To install the Power Analyzer using current clamps, plug the selected clamps into the
current input connectors (labeled IA, IB, IC, and IN) then clamp around the source
to be measured. An arrow on the current clamp indicates the direction of the load.
IA IB IC IN
Содержание PQ2000
Страница 2: ......
Страница 3: ...MPQ2000 PQ Analyzer...
Страница 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Страница 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Страница 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Страница 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Страница 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Страница 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Страница 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...
Страница 50: ...M MPQ2000 UG EN Rev 8 October 2018 44 IA V ROTATION N A VA IA LOAD 2 WIRE SINGLE PHASE SINGLE WATTMETER...
Страница 52: ...M MPQ2000 UG EN Rev 8 October 2018 46 VAC VBC LOAD IA IB 3 WIRE DELTA CONNECTION 2 WATTMETER METHOD B C A...
Страница 54: ...M MPQ2000 UG EN Rev 8 October 2018 48 VAN VBN IA IB LOAD 3 WIRE NETWORK METER B N A ROTATION ABC ROTATION ACB...
Страница 88: ...M MPQ2000 UG EN Rev 8 October 2018 82 M...
Страница 94: ...M MPQ2000 UG EN Rev 8 October 2018 88 M...