MPQ2000 Operation
MPQ2000-UG-EN Rev 8 October 2018
35
Activating the Imported Setup File
1.
Return to the MAIN MENU
2.
Scroll down to SETUP on the MAIN Menu and press the ENTER
key. This
will display the
Setup Files
screen.
3.
Scroll down to SELECT on the
Setup Files
screen and press the ENTER
key.
This will display the
setup files
in the unit.
4.
Scroll down to the
setup file
you wish to activate press the ENTER
key. This
will
activate
the setup file.
5.
Press the ENTER
key to close the activated message.
Содержание PQ2000
Страница 2: ......
Страница 3: ...MPQ2000 PQ Analyzer...
Страница 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Страница 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Страница 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Страница 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Страница 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Страница 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Страница 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...
Страница 50: ...M MPQ2000 UG EN Rev 8 October 2018 44 IA V ROTATION N A VA IA LOAD 2 WIRE SINGLE PHASE SINGLE WATTMETER...
Страница 52: ...M MPQ2000 UG EN Rev 8 October 2018 46 VAC VBC LOAD IA IB 3 WIRE DELTA CONNECTION 2 WATTMETER METHOD B C A...
Страница 54: ...M MPQ2000 UG EN Rev 8 October 2018 48 VAN VBN IA IB LOAD 3 WIRE NETWORK METER B N A ROTATION ABC ROTATION ACB...
Страница 88: ...M MPQ2000 UG EN Rev 8 October 2018 82 M...
Страница 94: ...M MPQ2000 UG EN Rev 8 October 2018 88 M...