MPQ2000-UG-EN Rev 8 October 2018
39
7
Installing the MPQ2000 PQ Analyzer
WARNING!
Be sure to use all appropriate safety equipment when installing
the MPQ2000 PQ Analyzer. Failure to do so can result in injury
or death.
WARNING!
Inspect all power cords and wires for proper insulation integrity
before connecting to any power source.
WARNING!
Exposure to excessive dust and submersing in water may result
in equipment damage
.
The installation procedure consists of:
1.
Charging the units battery prior to use.
2.
Ensure that the MPQ2000 PQ Analyzer is not exposed to water, excessive dust,
and other hazardous conditions. The MPQ2000 PQ Analyzer is not meant for
outdoor use.
3.
Making electrical connections.
Always complete all connections before beginning recording. Always stop
recording before removing connections.
Содержание PQ2000
Страница 2: ......
Страница 3: ...MPQ2000 PQ Analyzer...
Страница 8: ...M MPQ2000 UG EN Rev 8 October 2018 2 M...
Страница 10: ...M MPQ2000 UG EN Rev 8 October 2018 4 M...
Страница 18: ...M MPQ2000 UG EN Rev 8 October 2018 12 M...
Страница 22: ...MPQ2000 UG EN Rev 8 October 2018 16 M...
Страница 27: ...MPQ2000 Operation MPQ2000 UG EN Rev 8 October 2018 21 Menu Flow Charts DMM Screen...
Страница 28: ...M MPQ2000 UG EN Rev 8 October 2018 22 DMM Mode...
Страница 48: ...M MPQ2000 UG EN Rev 8 October 2018 42 M...
Страница 50: ...M MPQ2000 UG EN Rev 8 October 2018 44 IA V ROTATION N A VA IA LOAD 2 WIRE SINGLE PHASE SINGLE WATTMETER...
Страница 52: ...M MPQ2000 UG EN Rev 8 October 2018 46 VAC VBC LOAD IA IB 3 WIRE DELTA CONNECTION 2 WATTMETER METHOD B C A...
Страница 54: ...M MPQ2000 UG EN Rev 8 October 2018 48 VAN VBN IA IB LOAD 3 WIRE NETWORK METER B N A ROTATION ABC ROTATION ACB...
Страница 88: ...M MPQ2000 UG EN Rev 8 October 2018 82 M...
Страница 94: ...M MPQ2000 UG EN Rev 8 October 2018 88 M...