Setting up the Baker ZTX
50 Baker DX 71-030 User Guide EN V10
www.megger.com
4.
Connect the high-voltage test leads of the Baker DX to the Baker ZTX unit’s recessed
bars on the rear of the unit as labeled:
Test lead 1 to the bar labeled “Test Lead 1.”
Test leads 2 and 3, and the Ground lead to the bar labeled “GND/L2/L3 Leads.”
Figure 51. DX leads and fixture connections to Baker ZTX rear panel.
5.
Connect the bar-to-bar test fixture to the black braided test head cable. There are two
connectors: a small circular one (sense) and a large one (source). Be sure both
connections are properly made.
Figure 52. ATF-5000 armature test fixture.
6.
After completing the setup process, ensure that the Baker DX is plugged into a good
grounded source (the Baker ZTX is powered by the DX).
Содержание Baker DX
Страница 1: ......
Страница 2: ......
Страница 10: ...Table of Contents viii Baker DX 71 030 User Guide EN V10 www megger com...
Страница 28: ...Baker DX Instrument Overview 18 Baker DX 71 030 User Guide EN V10 www megger com...
Страница 38: ...Baker DX User Interface Overview 28 Baker DX 71 030 User Guide EN V10 www megger com...
Страница 58: ...Setting up the Baker DX Tester 48 Baker DX 71 030 User Guide EN V10 www megger com...
Страница 149: ...megger com 139 RIC Templates Figure 141 RIC template 1...
Страница 150: ...RIC templates 140 Baker DX 71 030 User Guide EN V10 www megger com Figure 142 RIC template 2...
Страница 155: ...Index megger com 145...
Страница 156: ...megger com 146...