Sentinel 100 - Hardware Installation Guide
10
media5corp.com
Getting Started
Installation Check List
Task
Verified by
Date
Network information available
and recorded in site log.
Location requirements verified.
Site power Voltage.
Installation site pre-power
check completed.
Mounting tools and equipment
available.
Additional equipment available.
Mediatrix unit received.
Quick start guide received.
Regulatory compliance and
safety information received.
Warranty card received.
Software version verified
Rack, desktop mounting of
chassis completed.
Initial electrical connections
established.
Cable length limits verified.
Initial configuration performed.
Initial operation verified.