System Check, Test and Start Form
Check, Test and Start Procedure for SWP/SWT (Self-contained Air Conditioning Systems)
Job Name:
McQuay G.O. No.:
Installation Address:
City:
State:
Purchasing Contractor
:
City:
State:
Unit Model No.:
Serial No.:
Compressor No. 1 Serial No.
Compressor No. 2 Serial No.
Compressor No. 3 Serial No.
Compressor No. 4 Serial No.
Compressor No. 5 Serial No.
Compressor No. 6 Serial No.
Mark N/A on all items not applying to the type of the unit. See IM Bulletin for more information. Any additional comments
may be made on a separate sheet of paper and attached to this form.
INITIAL CHECK
A.
Is any shipping damage visible?
Yes
No
B.
Is unit installed level?
Yes
No
C.
Is unit positioned to provide adequate free area for service and operation?
Yes
No
D.
Are fan drives properly aligned and belts adjusted?
Yes
No
E.
Does fan turn freely?
Yes
No
F.
Tightened all setscrews on pulleys, bearings and fans?
Yes
No
G.
Have the Condenser Water Temperature Sensors been located correctly?
Yes
No
H.
Has the Installing Contractor installed the Return Air Temperature Sensor
in the Return Air stream?
Yes
No
I
Has the Installing Contractor installed the high & low Static Pressure Sensor
tubing in the ductwork?
Yes
No
J.
Does electrical service correspond to unit nameplate?
Yes
No
K.
Adequate disconnect and circuit protectors installed?
Yes
No
L.
Is the unit adequately grounded?
Yes
No
M.
Are all electrical power connections tight?
Yes
No
N.
Have the compressor heaters operated continuously for 24 hours prior to start up?
Yes
No
O.
Does all electrical wiring conform to unit electrical diagram?
Yes
No
P.
Does all field wiring conform to electrical diagrams?
Yes
No
Q .
Are all service valves open?
Yes
No
R.
Have all the shipping hold-down plates securing the fan frame been removed?
Yes
No
S.
Unit with ducted return, has the low side tubing for PC5 (dirty filter switch) been
Installed?
Yes
No
T.
Are all the cleanout plugs installed (condenser, condensate trap & optional
waterside economizer)?
Yes
No
Compressorized Equipment Warranty Registration Form:
This form must be filled out and returned to McQuay, Warranty
Department, within 10 days in order to comply with the terms of
McQuay Warranty.
Содержание SWT C Series
Страница 23: ...IM709 23 Typical Wiring Schematics Figure 19 Power Schematic...
Страница 24: ...24 IM709 Figure 20 Input Schematic Discharge Air Control DAC...
Страница 25: ...IM709 25 Figure 21 Input Schematic Zone or Space Comfort Control SCC...
Страница 26: ...26 IM709 Figure 22 Output Schematic Actuator Control...
Страница 27: ...IM709 27 Figure 23 Output Schematic Auxiliary Fan Start Stop Control...
Страница 28: ...28 IM709 Figure 24 Output Schematic Actuator Control...
Страница 29: ...IM709 29 Figure 25 Output Schematic Compressor Control 4 Compressors 4 5 or 6 Stage...
Страница 44: ...13600 Industrial Park Boulevard Minneapolis MN 55441 USA 763 553 5330...