background image

©1999 AAF–McQuay Incorporated

Incremental

®

 Comfort Conditioners

Suite II

®

With Top Mounted

Hydronic Heat Section

Installation & Maintenance Data

  Group:  PTAC

  Part No.:  106018561

  Date:  May 1999

IM 422-4 / Page 1 (Rev. 5/99)

IM 422-4

Содержание 106018561

Страница 1: ...McQuay Incorporated Incremental Comfort Conditioners Suite II With Top Mounted Hydronic Heat Section Installation Maintenance Data Group PTAC Part No 106018561 Date May 1999 IM 422 4 Page 1 Rev 5 99...

Страница 2: ...installer exercise caution This equipment is to be installed only by an experienced installation company which employs trained personnel Inspection When the equipment is received all items should be c...

Страница 3: ...Piping Rough in Typ R H L H 3 76mm Min 3 76mm Kickplate Removable Front 7 8 22mm Wall Thickness C A 11 4 32mm 27 8 67mm 16 406mm B 91 8 232mm 51 2 140mm 7 8 22mm 15 8 41mm 15 16 33mm 3 76mm Min Kickp...

Страница 4: ...uctions For panel wall and thin wall construction it is recommended that the optional top angle be used and the wall sleeve be supplied with a turned down flange see Figure 3 The recommended procedure...

Страница 5: ...nd the finished wall surface This is to accommodate the heat section and room cabinet The center of gravity is 103 4 273mm from the rear face of the standard wall sleeve If no subbase is being employe...

Страница 6: ...the brickstop contacts the exterior bricks as illustrated below If a brickstop is not used slide the wall sleeve in the wall so that it extends into the room a minimum of 11 8 29mm beyond the finishe...

Страница 7: ...supplied and pipe it according to the illustration Install valve and other accessories including air vents steam traps stop balance valves etc as specified by the design engIneer 5 For valve installed...

Страница 8: ...the condenser coil cover 8 If louver has not been previously installed connect to wall sleeve as described above 9 If louver is supplied by others as illustrated in Figure 4 page 5 be sure to install...

Страница 9: ...the hold down screw 4 Screw the cabinet to the wall using the screws provided There are two 2 screw holes provided on each side located on the inner flanges of the room cabinet 5 Loosen the four 4 win...

Страница 10: ...ld provide uninterrupted service for many years Scheduled maintenance of this equipment as described below is the key to the equipment s longevity 1 Air filters must be cleaned at regular intervals Tw...

Страница 11: ...0 Units Cooling Chassis 1 Compressor Overload Device 1 Compressor Running Capacitor 1 Evaporator Fan Motor 1 Condenser Fan Motor 1 Pushbutton Switch 2 Damper Switch 2 Thermostat 2 Knob for Thermostat...

Страница 12: ...nly TROUBLE CAUSE CURE 1 Blowers won t operate on COOL 2 Blowers operate on COOL but compressor doesn t start 3 Blowers run on COOL and compressor starts but stops after a short interval 4 Blowers run...

Страница 13: ...or c Align blower assembly and tighten nuts d Noise will disappear after equipment runs awhile e Make necessary adjustments to components f Check for proper adjustment Apply silicone oil or grease to...

Страница 14: ...IM 422 4 Page 14 Rev 5 99 Wiring Diagram Standard Manual Changeover Control Hydronic Heat With Normally Open Valve...

Страница 15: ...IM 422 4 Page 15 Rev 5 99 Wiring Diagram Standard Manual Changeover Control Hydronic Heat With Normally Closed Valve...

Страница 16: ...of the product is other than that published by the Company One Year Refrigeration Circuit Warranty Hermetically sealed motor compressor assemblies and all components of refrigeration circuits not read...

Отзывы: