Loading Pipe onto the PolyHorse
NOTICE:
Pipe should be positioned as shown, being careful not to come in contact with the fusion machine.
Pipe should be loaded to allow a minimum of 6 ft. of pipe at the end of the rack to extend past the last truss, so that
when pipe is fed into the machine, the pipe is still supported by the last roller.
Use only proper lifting equipment and safety rigging when lifting and moving bundles of pipe.
Pipe Handling
PH
03
43
6-1-
4-
07
6 - 1