3 - 3
Initial Setup
Adjusting the Front Height
Before loading any pipe, adjust the height of each front screw
jack using speed wrench.
The height of the pipe rollers should allow the pipe to be inline
with the fusion machine jaws.
IMPORTANT:
A string or a low cost laser level can be used
to check the height of each roller to the height of the fusion
machine jaws.
TX02688-12-6-06
PH
03
30
8-10
-16
-06
Adjusting the Rear Height
Adjust the height of each rear screw jack using speed wrench.
The height of the pipe rollers should allow the pipe to be inline
with the fusion machine jaws.
When adjusting the height you can use the spirit levels to
determine amount of incline away from the roller end.
NOTICE:
Adjusting the three truss assemblies with a slight decline
away from the roller end will help control the dispensing of the
pipe.
TX02689-12-6-06
PH
03
30
9-10
-16
-06
PH
03
310
-10
-16
-06
Adjusting Roller Assembly Drop Foot Height
Remove the pin and allow the drop foot to touch the ground.
Find the nearest holes that line up and insert the detent pin in
that position.
Never use pipe racks without drop foot
properly in place. Failure to do so may cause
racks to tip and injury may occur.
TX02690-12-6-06
PH
03
311-10
-16
-06
Direction pipe
will roll
Raise Jacks
PH
03
341-1-
4-
07