2
©
2012 Mobile Climate Control
T-348 Rev. 07/2012
Operating Instructions, 2-1
OPTION DESCRIPTION, 1-1
P
Pre-Trip Inspection, 2-2
Pressure Transducer, 1-9, 4-17, 4-18
Pump Down, 4-4, 4-7
R
Refrigerant Charge, 1-8, 4-4, 4-8, 4-9
Refrigerant Removal, 4-5, 4-7
Refrigeration Cycle, 1-11
Relay Board, 1-17, 1-18, 1-19
Relay Board - GR60, 1-17, 1-18
Rooftop Unit, 1-5
S
SAFETY DEVICES, 1-9
Self Diagnostics, 3-1
SERVICE, 4-1
Service Valves, 4-3
Suction Pressure, 2-3
Superheat, 4-12
System Parameters, 2-5
System Shutdown, 2-1
System Start-up, 2-1
T
Temperature Control, 2-3
Temperature Pressure Chart, 4-20
Temperature Sensor, 1-9, 4-17, 4-18
Thermostatic Expansion Valve, 1-8, 4-12
Top Cover, 4-2
Troubleshooting, 3-1
Troubleshooting No CAN Communication, 3-2
U
Unloader Control, 2-3
V
Vent Mode, 2-3
W
Water Temperature Switch, 1-8, 1-9
Wiring Schematics, 5-1