background image

 

Installation and use 

SEEDER MONITOR MCK 1200 

20 

 

7. Maintenance 

This  chapter  gives  instructions  on  how  to  carry  out  ordinary  and  extraordinary 
maintenance. 

Ordinary  maintenance  refers  to  those  operations  which  must  be  carried  out 
periodically.  As  they  do  not  require  specific  skills,  they  can  be  carried  out  by  the 
users (operators etc.). 

Extraordinary maintenance refers to unforeseeable operations due to mechanic or 
electric failures. They require specific technical skills, so they should be exclusively 
carried out by qualified personnel (maintenance personnel etc.). 

7.1 Ordinary maintenance 

Ordinary  maintenance  consists  in  cleaning  the  instrument.  Clean  the  instrument 
with a wet cloth and mild detergent to avoid erasing the serigraphs on the panel.  

 

Warning 

 

Do not use pressure water jets. 

 

Do not use abrasive products, solvents or alcohol

 

Do not press on the keyboard with pointed or hard objects in order 
to  avoid  damaging  the  polyester  film,  thus  endangering  the 
impermeability of the keyboard. 

 

7.1.1 How to protect the main connector 

In case of an extended use of the MONITOR MCK 1200 it is advisable to disconnect 
the  main  signal  connector    from  the  harness.  It  is  advisable  to  insulate  both  the 
connectors (of the Monitor and of the Harness) by using a Nylon protection. 

If  the  connectors  of  the  monitor  and  of  the  harness  are  NOT  disconnected  no 
protection is needed. 

 

7.2 Extraordinary maintenance 

 

Warning 

Extraordinary maintenance must be carried out by authorized personnel 
only.
 

 

 

 

Содержание MCK 1200

Страница 1: ...MCK 1200 COMPUTER FOR PRECISION SEED DRILLS USER S MANUAL NR 2839 EN REV 1 EN...

Страница 2: ...IGO ITALY Tel 39 0425 754713 Fax 39 0425 741130 E mail mcstaff mcelettronica it Internet www mcelettronica it Manual code 2839 EN Issued February 2012 Edition November 2014 MC elettronica S r l is not...

Страница 3: ...e C parameter to be programmed 16 6 3 Automatic calibration of C parameter 17 6 4 How to programming the delay between visual and acoustic alarm 17 6 5 How to programming the sensitivity of seeds to c...

Страница 4: ...use of the equipment After buying the instrument read the manual carefully and refer to it any time you have doubts on how to use the equipment or when you have to carry out maintenance operations Ke...

Страница 5: ...properly act of God lightning floods fire or other causes which do not depend from MC elettronica Repairs under guarantee which must be carried out in the laboratories of our authorized centres are e...

Страница 6: ...he operation of the file indicating the LCD by horizontal bars any abnormality of sowing During the working cycle the following data are displayed and controlled the width width PROG the working area...

Страница 7: ...and the photocells Insert the connector of the photocell fitted on the 1st element of the seed drill onto the connector of cable 1 N B The first element of the seed drill can be considered the one on...

Страница 8: ...mechanic movement in the wheel front or rear wheel of the agricultural vehicle machine or by making a metal reference which sticks out of at least 7 mm Figure 2 ref C We recommend to install the speed...

Страница 9: ...pplication of a six row wiring cod CAB SEM 002 by selecting the first row of the left of the planter fix the junction box A at the centre of the seed drill with some clamps held to the machine For ins...

Страница 10: ...stallation on the pipe cod 10FOT SEMIMINUTI 0001 Figure 5 Example of installation on the sowing element cod 4228 and cod 10FOT SEMIMINUTI 0001 Optical elements Clamps Amplifier for photocell Electric...

Страница 11: ...the programming phase it increases the displayed value B WIDTH PROG key it allows the operator to display and change the working width C ha TOTAL e key it shows the total area worked in hectares range...

Страница 12: ...80 cm CAB SEM 002 Cable 6 rows x 80 cm CAB SEM 003 Cable 8 rows x 80 cm CAB SEM 004 Cable 12 rows x 80 cm NOTE cables must be ordered according to the type of seed drill used the following data are r...

Страница 13: ...hold down any key for about 3 seconds while the display visualizes working hours after the initial test operated at the switching on After working hours the monitor displays the rows which are operati...

Страница 14: ...y Keeping width PROG key pressed hold down also key rif A fig 1 to increase or key rif C fig 1 to decrease the displayed value until the desired value is obtained expressed in metres and centimetres f...

Страница 15: ...the current parameter value preceded by letter C flashing then release keys Press key ref A fig 1 to increase or key ref C fig 1 to decrease the displayed value until the desired value from 20 to 999...

Страница 16: ...for our example let s say 30 then stop the machine end point Figure 5 ref B to obtain highest precision of setting you ll need to go at least 50 meters 3 measure the distance from the starting point t...

Страница 17: ...brief alarm events on one or multiple rows the operator is not continuously disturbed by the buzzer With the monitor switched off press keys A B and C together and while keeping them pressed switch t...

Страница 18: ...hich the visual alarm is triggered followed by the acoustic one The same time applies for the resetting of the alarm the programmable values range from 21 to 28 and correspond to the following times 2...

Страница 19: ...owing Turn on the Monitor button ON OFF and wait until the display shows the 0 0 Simulated test With one of your fingers or with a small object pass in front of each photocell if the photocell is corr...

Страница 20: ...ment Clean the instrument with a wet cloth and mild detergent to avoid erasing the serigraphs on the panel Warning Do not use pressure water jets Do not use abrasive products solvents or alcohol Do no...

Страница 21: ...Weather conditions Relative humidity 90 Transport and storage Temperature 25 C 85 C 8 2 Technical data accessories 8 2 1 Speed sensor D 18 cod 481 Power supply voltage 8 VDC Output signal NAMUR Max w...

Страница 22: ...tection degree IP 68 8 2 4 Cables cod CAB SEM 001 CAB SEM 002 CAB SEM 003 CAB SEM 004 Main connector SICMA 24 way Connectors for photocells AMP 3 way Super seal IP 67 Cables for connecting photocells...

Страница 23: ...Installation and use SEEDER MONITOR MCK 1200 NOTE...

Страница 24: ...Printed in Italy SEEDER MONITOR MCK 1200 www mcelettronica it Electronic equipments for agricultural earth moving industrial machines...

Отзывы: